0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)

This publication lists 4 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10761909
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine