사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)
This publication has been cited in the following 2 other publication(s):
Advertisement
About this data sheet
Reference-ID 10761909
Published on: 15/03/2024
Last updated on: 15/03/2024
Advertisement
Structurae cooperates with
Advertisement
You have exceeded your monthly download limit!
Structurae Plus subscribers can download 30 media files or data sets per month.
Structurae Pro users are limited to 50.
Do you really want to delete this item from your favorites?
The item was successfuly added to the shopping cart.Could not add item to the shopping cart. Please try again.This item has already been added to the shopping cart and cannot be added again.