사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)
Auteur(s): |
Tae-Jea Cho
Jong-Soo Choi |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), février 2011, n. 1, v. 11 |
Page(s): | 9-17 |
DOI: | 10.5345/jkic.2011.02.1.009 |
- Informations
sur cette fiche - Reference-ID
10761909 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024