Road bridge deck replacements for the East London Line project
|
Bibliographic Details
Author(s): |
Riccardo Stroscio
Andrew Bradshaw |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013 | ||||
Published in: | IABSE Conference, Rotterdam, May 2013 | ||||
|
|||||
Page(s): | 604-605 | ||||
Total no. of pages: | 8 | ||||
Year: | 2013 | ||||
DOI: | 10.2749/222137813806548523 | ||||
Abstract: |
This case study paper describes the design and construction of two road bridge deck replacement schemes in London where value engineering maximized value for the client, minimized costs, and minimized traffic and utilities disruption during the works. |
||||
Keywords: |
prestressed concrete steel-concrete composite road bridge deck replacement
|