Road bridge deck replacements for the East London Line project
|
Bibliografische Angaben
Autor(en): |
Riccardo Stroscio
Andrew Bradshaw |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013 | ||||
Veröffentlicht in: | IABSE Conference, Rotterdam, May 2013 | ||||
|
|||||
Seite(n): | 604-605 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2013 | ||||
DOI: | 10.2749/222137813806548523 | ||||
Abstrakt: |
This case study paper describes the design and construction of two road bridge deck replacement schemes in London where value engineering maximized value for the client, minimized costs, and minimized traffic and utilities disruption during the works. |