Road bridge deck replacements for the East London Line project
|
Détails bibliographiques
Auteur(s): |
Riccardo Stroscio
Andrew Bradshaw |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013 | ||||
Publié dans: | IABSE Conference, Rotterdam, May 2013 | ||||
|
|||||
Page(s): | 604-605 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2013 | ||||
DOI: | 10.2749/222137813806548523 | ||||
Abstrait: |
This case study paper describes the design and construction of two road bridge deck replacement schemes in London where value engineering maximized value for the client, minimized costs, and minimized traffic and utilities disruption during the works. |