General Information
Completion: | 1869 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Commuter rail line |
---|
Location
Technical Information
Dimensions
total length | 7.4 km | |
number of stations | 8 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Bridgeworks on the East London railway line extension, UK. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 161, n. 2 (June 2008), pp. 89-98. (2008):
- Design and construction of stations on the East London line. In: Proceedings of the Institution of Civil Engineers - Transport, v. 166, n. 1 (February 2013), pp. 14-18. (2013):
- East London line enabling works contracts. In: Proceedings of the Institution of Civil Engineers - Transport, v. 166, n. 1 (February 2013), pp. 3-13. (2013):
- East London Line Phase 1A Over Site Development. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- (2013): East London Line Phase 2. Presented at: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, pp. 634-635.
- About this
data sheet - Structure-ID
10000471 - Published on:
07/03/2004 - Last updated on:
28/05/2021