Cable-stayed Bridges across the Panama Canal and the Orinoco
|
Bibliographic Details
Author(s): |
Karl Humpf
Reiner Saul |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Published in: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 56-57 | ||||
Total no. of pages: | 8 | ||||
Year: | 2007 | ||||
DOI: | 10.2749/222137807796119627 | ||||
Abstract: |
This paper presents two major bridges in South America which have been designed and built in record periods in geotechnical and seismically critical areas combining effectively local workforce and international experience. |
||||
Keywords: |
composite seismic cable-stayed design-build fast-track cast-in-drilled-hole piles segmental launching method free cantilevering
|