Cable-stayed Bridges across the Panama Canal and the Orinoco
|
Bibliografische Angaben
Autor(en): |
Karl Humpf
Reiner Saul |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Veröffentlicht in: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Seite(n): | 56-57 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2007 | ||||
DOI: | 10.2749/222137807796119627 | ||||
Abstrakt: |
This paper presents two major bridges in South America which have been designed and built in record periods in geotechnical and seismically critical areas combining effectively local workforce and international experience. |
||||
Stichwörter: |
Verbund
|