Cable-stayed Bridges across the Panama Canal and the Orinoco
|
Détails bibliographiques
Auteur(s): |
Karl Humpf
Reiner Saul |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Publié dans: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 56-57 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2007 | ||||
DOI: | 10.2749/222137807796119627 | ||||
Abstrait: |
This paper presents two major bridges in South America which have been designed and built in record periods in geotechnical and seismically critical areas combining effectively local workforce and international experience. |