0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Zhang, Hong / He, Jiangxia / Jiang, Xiaogang / Gong, Yanfeng / Hu, Tianyu / Jiang, Tengjiao / Zhou, Jianting: Quantitative Characterization of Surface Defects on Bridge Cable based on Improved YOLACT++. In: Case Studies in Construction Materials.

    https://doi.org/10.1016/j.cscm.2024.e03953

  2. Gu, Xiang-Lin / Zhou, Tian / Nagai, Kohei / Zhang, Hong / Yu, Qian-Qian (2024): Prediction of seismic performance of a masonry-infilled RC frame based on DEM and ANNs. In: Engineering Structures, v. 316 (October 2024).

    https://doi.org/10.1016/j.engstruct.2024.118531

  3. Li, Houxuan / Zhang, Hong / Zhao, Bin / Zhao, Ge (2024): Prediction methods for residual load-bearing capacity and service life of bridge cables. In: Journal of Constructional Steel Research, v. 219 (August 2024).

    https://doi.org/10.1016/j.jcsr.2024.108797

  4. Liu, Cong / Zhang, Fangqing / Zhang, Hong / Shi, Zanxi / Zhu, Hanqing (2023): Optimization of assembly sequence of building components based on simulated annealing genetic algorithm. In: Alexandria Engineering Journal, v. 62 (January 2023).

    https://doi.org/10.1016/j.aej.2022.07.025

  5. Bai, Zhiwei / Yan, Honghong / Zhang, Hong / Su, Chang / Zhang, Longbao / Wang, Jiajie (2024): Numerical Simulation Study of the Optimal Parameters for Dust Reduction by an External Air Curtain (EAC) in Continuous Mining Tunnel. In: Journal of Environmental Engineering (ASCE), v. 150, n. 5 (May 2024).

    https://doi.org/10.1061/joeedu.eeeng-7465

  6. Karamoozian, Masood / Zhang, Hong: Obstacles to green building accreditation during operating phases: identifying Challenges and solutions for sustainable development. In: Journal of Asian Architecture and Building Engineering.

    https://doi.org/10.1080/13467581.2023.2280697

  7. Takyi-Annan, Georgina Esi / Zhang, Hong (2023): A Multivariate Analysis of the Variables Impacting the Level of BIM Expertise of Professionals in the Architecture, Engineering and Construction (AEC) Industries of the Developing World Using Nonparametric Tests. In: Buildings, v. 13, n. 7 (28 June 2023).

    https://doi.org/10.3390/buildings13071606

  8. Qu, Kaichen / Zhang, Hong / Zhou, Xin / Causone, Francesco / Huang, Xiaoqing / Shen, Xiumei / Zhu, Xiao (2023): Optimal design of building integrated energy systems by combining two-phase optimization and a data-driven model. In: Energy and Buildings, v. 295 (September 2023).

    https://doi.org/10.1016/j.enbuild.2023.113304

  9. Zhang, Hong / Xia, Junfeng / Zhou, Jianting / Liao, Leng / Xiao, Yangjian / Tong, Kai / Zhang, Senhua (2023): Prestress monitoring for prestress tendons based on the resonance-enhanced magnetoelastic method considering the construction process. In: Structural Health Monitoring, v. 23, n. 2 (July 2023).

    https://doi.org/10.1177/14759217231178453

  10. Wu, Bo / Zhou, Jianting / Xin, Jingzhou / Zhang, Hong / Wu, Fengbo (2023): A Numerical-Experimental Framework to Separate the Effects of Different Turbulence Components on the Buffeting Forces of Bluff-body Structures. In: KSCE Journal of Civil Engineering, v. 27, n. 8 (June 2023).

    https://doi.org/10.1007/s12205-023-0675-y

  11. Zhang, Hong / Lin, Yilei (2023): Prediction of Ergonomic Risks and Impacts on Construction Schedule through Agent-Based Simulation. In: Journal of Construction Engineering and Management, v. 149, n. 3 (March 2023).

    https://doi.org/10.1061/(asce)co.1943-7862.0002437

  12. Hu, Tianyu / Zhang, Hong / Zhou, Jianting (2023): Prediction of the Debonding Failure of Beams Strengthened with FRP through Machine Learning Models. In: Buildings, v. 13, n. 3 (26 February 2023).

    https://doi.org/10.3390/buildings13030608

  13. Yan, Xuzhong / Zhang, Hong / Gao, Hui (2022): Mutually coupled detection and tracking of trucks for monitoring construction material arrival delays. In: Automation in Construction, v. 142 (October 2022).

    https://doi.org/10.1016/j.autcon.2022.104491

  14. Huang, Yue / Zhao, Pengtuan / Lu, Yiyan / Zhang, Hong (2022): Push-out tests of CFST columns strengthened with self-compacting and self-stressing concrete filled square steel tube. In: Journal of Constructional Steel Research, v. 193 (June 2022).

    https://doi.org/10.1016/j.jcsr.2022.107263

  15. Zhou, Hong / Wang, Jiangchao / Zhang, Hong / Liu, Jiancheng / Mo, Zhonghua (2021): Prediction and mitigation of out-of-plane welding distortion of a typical block in fabrication of a semi-submersible lifting and disassembly platform. In: Marine Structures, v. 77 (May 2021).

    https://doi.org/10.1016/j.marstruc.2021.102964

  16. Song, Taoran / Pu, Hao / Schonfeld, Paul / Li, Wei / Zhang, Hong / Ren, Yuhan / Wang, Jie / Hu, Jianping / Peng, Xianbao (2020): Parallel Three-Dimensional Distance Transform for Railway Alignment Optimization Using OpenMP. In: Journal of Transportation Engineering, Part A: Systems, v. 146, n. 5 (May 2020).

    https://doi.org/10.1061/jtepbs.0000344

  17. Liu, Xiaoben / Zhang, Hong / Xia, Mengying / Chen, Yanfei / Wu, Kai / Wang, Baodong: Numerical Analysis and Strength Evaluation of an Exposed River Crossing Pipeline with Casing Under Flood Load. In: Periodica Polytechnica Civil Engineering.

    https://doi.org/10.3311/ppci.11605

  18. Zhang, Hong / Shi, Dongyan / Zha, Shuai / Wang, Qingshan (2018): Parameterization study on the moderately thick laminated rectangular plate-cavity coupling system with uniform or non-uniform boundary conditions. In: Composite Structures, v. 194 (June 2018).

    https://doi.org/10.1016/j.compstruct.2018.04.034

  19. Zhang, Hong (2013): The Planning Design of Ecological Residence Area Based on Sustainable Development Concept. In: Applied Mechanics and Materials, v. 357-360 (August 2013).

    https://doi.org/10.4028/www.scientific.net/AMM.357-360.1652

  20. Liu, Lu / Zheng, Dan / Zhou, Jianting / Yang, Juan / Zhang, Hong (2020): Parameters That Influence Corrosion Detection in Reinforced Concrete Based on Eddy Current Thermography. In: Advances in Civil Engineering, v. 2020 (January 2020).

    https://doi.org/10.1155/2020/7962945

  21. Zhang, Hong / Jin, Rui / Li, Heng / Skibniewski, Mirosław J. (2018): Pavement Maintenance–Focused Decision Analysis on Concession Periods of PPP Highway Projects. In: Journal of Management in Engineering (ASCE), v. 34, n. 1 (January 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000568

  22. Zhang, Hong / Li, Heng / Tam, C. M. (2006): Permutation-Based Particle Swarm Optimization for Resource-Constrained Project Scheduling. In: Journal of Computing in Civil Engineering, v. 20, n. 2 (March 2006).

    https://doi.org/10.1061/(asce)0887-3801(2006)20:2(141)

  23. Zhang, Hong / Tam, C. M. / Li, Heng (2006): Multimode Project Scheduling Based on Particle Swarm Optimization. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 2 (February 2006).

    https://doi.org/10.1111/j.1467-8667.2005.00420.x

  24. Zhang, Hong / Li, Xiaodong / Li, Heng / Huang, Fulai (2005): Particle swarm optimization-based schemes for resource-constrained project scheduling. In: Automation in Construction, v. 14, n. 3 (June 2005).

    https://doi.org/10.1016/j.autcon.2004.08.006

  25. Zhang, Hong / Yang, Fei / Li, Yang / Li, Heng (2015): Predicting profitability of listed construction companies based on principal component analysis and support vector machine—Evidence from China. In: Automation in Construction, v. 53 (May 2015).

    https://doi.org/10.1016/j.autcon.2015.03.001

  26. Zhang, Hong / Wang, Jia Yuan (2008): Particle Swarm Optimization for Construction Site Unequal-Area Layout. In: Journal of Construction Engineering and Management, v. 134, n. 9 (September 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:9(739)

  27. Zhang, Hong / Li, Heng / Tam, C. M. (2006): Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. In: Journal of Construction Engineering and Management, v. 132, n. 3 (March 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(259)

  28. Zhang, Hong / Tam, C. M. / Li, Heng / Shi, Jonathan Jingsheng (2006): Particle Swarm Optimization-Supported Simulation for Construction Operations. In: Journal of Construction Engineering and Management, v. 132, n. 12 (December 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:12(1267)

  29. Zhang, Hong / Li, Heng (2010): Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems. In: Construction Management and Economics, v. 28, n. 1 (January 2010).

    https://doi.org/10.1080/01446190903406170

  30. Zhang, Hong / You, Xinpeng / Zhang, Yongtao (2015): A New Solution for Fabrication & Erection of Composite Box Girder of Cable-Stayed Bridge. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.

    https://doi.org/10.2749/222137815818358835

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine