Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints
Author(s): |
Hong Zhang
Heng Li C. M. Tam |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, March 2006, n. 3, v. 132 |
Page(s): | 259-267 |
DOI: | 10.1061/(asce)0733-9364(2006)132:3(259) |
- About this
data sheet - Reference-ID
10162336 - Published on:
07/12/2018 - Last updated on:
07/12/2018