Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints
Auteur(s): |
Hong Zhang
Heng Li C. M. Tam |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mars 2006, n. 3, v. 132 |
Page(s): | 259-267 |
DOI: | 10.1061/(asce)0733-9364(2006)132:3(259) |
- Informations
sur cette fiche - Reference-ID
10162336 - Publié(e) le:
07.12.2018 - Modifié(e) le:
07.12.2018