0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Prediction of Ergonomic Risks and Impacts on Construction Schedule through Agent-Based Simulation

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0002437.
  • About this
    data sheet
  • Reference-ID
    10708280
  • Published on:
    21/03/2023
  • Last updated on:
    21/03/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine