0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kim, Taehoon / Lim, Hyunsu / Jang, Hyoun-Seung / Yu, Jung-Ho / Cho, Hunhee / Kang, Kyung-In (2016): 해외건설 동반진출 활성화를 위한 해외건설 상호협력 평가제도 구축 (Establishment of Cooperation Evaluation System between Domestic Large Enterprises and Small/Medium-Sized Enterprises for Invigorating Joint Overseas Expansion). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 3 (June 2016).

    https://doi.org/10.5345/jkibc.2016.16.3.257

  2. Lee, Seul Ki / Yu, Jung-Ho (2013): Effects of Intrinsic and Extrinsic Motivation Factors on BIM Acceptance. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 3 (June 2013).

    https://doi.org/10.5345/jkibc.2013.13.3.242

  3. An, Hyo-Kyung / Lee, Seul-Ki / Lee, Hyoung-Lak / Yu, Jung-Ho (2012): Analysis of Quality Improvement Priority for Construction PMIS. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 1 (February 2012).

    https://doi.org/10.5345/jkibc.2012.12.1.010

  4. Sung, Min-Woo / Kim, Ka-Ram / Lee, Seul-Ki / Yu, Jung-Ho (2012): 건설 PMIS 품질이 사용의도 및 사용자 만족도에 미치는 영향 (Effect of PMIS Quality on Intention to Use and User Satisfaction). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 1 (February 2012).

    https://doi.org/10.5345/jkibc.2012.12.1.122

  5. Lee, Seul-Ki / Lee, Hyoung-Lak / Yu, Jung-Ho (2010): PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석 (The Effect of PMIS Quality on Project Management Success). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 6 (December 2010).

    https://doi.org/10.5345/jkic.2010.12.6.117

  6. Kwon, Hae-Rim / Yu, Jung-Ho (2009): 지하층 도막방수공사의 중점관리요인 (Critical Management Factors of Fluid-Applied Membrane Waterproofing Work for building basements). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 6 (December 2009).

    https://doi.org/10.5345/jkic.2009.9.6.091

  7. Lee, Seul-Ki / Yu, Jung-Ho (2023): Ontological inference process using AI-based object recognition for hazard awareness in construction sites. In: Automation in Construction, v. 153 (September 2023).

    https://doi.org/10.1016/j.autcon.2023.104961

  8. Yu, Jung-Ho / Jeon, Me-Yeon / Kim, Tae Wan (2015): Fuzzy-based Composite Indicator Development Methodology for Evaluating Overall Project Performance. In: Journal of Civil Engineering and Management, v. 21, n. 3 (February 2015).

    https://doi.org/10.3846/13923730.2014.890644

  9. Hong, Sim-Hee / Lee, Seul-Ki / Yu, Jung-Ho (2019): Automated management of green building material information using web crawling and ontology. In: Automation in Construction, v. 102 (June 2019).

    https://doi.org/10.1016/j.autcon.2019.01.015

  10. Yu, Jung-Ho / Jang, Hyoun-Seung / Kwon, Soon-Wook / Son, Bo-Sik (2013): Measures to expand market inroads into the Vietnamese construction market. In: KSCE Journal of Civil Engineering, v. 17, n. 7 (October 2013).

    https://doi.org/10.1007/s12205-013-0351-8

  11. Yu, Jung-Ho / Lee, Hyun-Soo / Kim, Wooyoung (2006): Evaluation Model for Information Systems Benefits in Construction Management Processes. In: Journal of Construction Engineering and Management, v. 132, n. 10 (October 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:10(1114)

  12. Kim, Tae Wan / Lee, Hyun-Soo / Park, Moonseo / Yu, Jung-Ho (2010): Productivity management methodology using productivity achievement ratio. In: KSCE Journal of Civil Engineering, v. 15, n. 1 (December 2010).

    https://doi.org/10.1007/s12205-011-0983-5

  13. Yu, Jung-Ho / Lee, Seul-Ki (2012): A conflict-risk assessment model for urban regeneration projects using Fuzzy-FMEA. In: KSCE Journal of Civil Engineering, v. 16, n. 7 (October 2012).

    https://doi.org/10.1007/s12205-012-1196-2

  14. Yu, Jung-Ho (2012): Dynamic priority evaluation model for IS adoption in construction management. In: KSCE Journal of Civil Engineering, v. 16, n. 6 (September 2012).

    https://doi.org/10.1007/s12205-012-1414-y

  15. Lee, Seul-Ki / Yu, Jung-Ho (2012): Success model of project management information system in construction. In: Automation in Construction, v. 25 (August 2012).

    https://doi.org/10.1016/j.autcon.2012.04.015

  16. Lim, Chul-Woo / Yu, Jung-Ho / Kim, Chang-Duk (2011): The development of work performance analysis system. In: Automation in Construction, v. 20, n. 1 (January 2011).

    https://doi.org/10.1016/j.autcon.2010.07.007

  17. Lee, Seul-Ki / Kim, Ka-Ram / Yu, Jung-Ho (2014): BIM and ontology-based approach for building cost estimation. In: Automation in Construction, v. 41 (May 2014).

    https://doi.org/10.1016/j.autcon.2013.10.020

  18. Lee, Hyun-Soo / Ryu, Han-Guk / Yu, Jung-Ho / Kim, Jae-Jun (2005): Method for Calculating Schedule Delay Considering Lost Productivity. In: Journal of Construction Engineering and Management, v. 131, n. 11 (November 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1147)

  19. Lee, Hyun-Soo / Yu, Jung-Ho / Kim, Sun-Kuk (2004): Impact of Labor Factors on Workflow. In: Journal of Construction Engineering and Management, v. 130, n. 6 (December 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:6(918)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine