Jung-Ho Yu
- 해외건설 동반진출 활성화를 위한 해외건설 상호협력 평가제도 구축 (Establishment of Cooperation Evaluation System between Domestic Large Enterprises and Small/Medium-Sized Enterprises for Invigorating Joint Overseas Expansion). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 3 (juin 2016). (2016):
- Effects of Intrinsic and Extrinsic Motivation Factors on BIM Acceptance. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 3 (juin 2013). (2013):
- Analysis of Quality Improvement Priority for Construction PMIS. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 1 (février 2012). (2012):
- 건설 PMIS 품질이 사용의도 및 사용자 만족도에 미치는 영향 (Effect of PMIS Quality on Intention to Use and User Satisfaction). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 1 (février 2012). (2012):
- PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석 (The Effect of PMIS Quality on Project Management Success). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 6 (décembre 2010). (2010):
- 지하층 도막방수공사의 중점관리요인 (Critical Management Factors of Fluid-Applied Membrane Waterproofing Work for building basements). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 6 (décembre 2009). (2009):
- Ontological inference process using AI-based object recognition for hazard awareness in construction sites. Dans: Automation in Construction, v. 153 (septembre 2023). (2023):
- Fuzzy-based Composite Indicator Development Methodology for Evaluating Overall Project Performance. Dans: Journal of Civil Engineering and Management, v. 21, n. 3 (février 2015). (2015):
- Automated management of green building material information using web crawling and ontology. Dans: Automation in Construction, v. 102 (juin 2019). (2019):
- Measures to expand market inroads into the Vietnamese construction market. Dans: KSCE Journal of Civil Engineering, v. 17, n. 7 (octobre 2013). (2013):
- Evaluation Model for Information Systems Benefits in Construction Management Processes. Dans: Journal of Construction Engineering and Management, v. 132, n. 10 (octobre 2006). (2006):
- Productivity management methodology using productivity achievement ratio. Dans: KSCE Journal of Civil Engineering, v. 15, n. 1 (décembre 2010). (2010):
- A conflict-risk assessment model for urban regeneration projects using Fuzzy-FMEA. Dans: KSCE Journal of Civil Engineering, v. 16, n. 7 (octobre 2012). (2012):
- Dynamic priority evaluation model for IS adoption in construction management. Dans: KSCE Journal of Civil Engineering, v. 16, n. 6 (septembre 2012). (2012):
- Success model of project management information system in construction. Dans: Automation in Construction, v. 25 (août 2012). (2012):
- The development of work performance analysis system. Dans: Automation in Construction, v. 20, n. 1 (janvier 2011). (2011):
- BIM and ontology-based approach for building cost estimation. Dans: Automation in Construction, v. 41 (mai 2014). (2014):
- Method for Calculating Schedule Delay Considering Lost Productivity. Dans: Journal of Construction Engineering and Management, v. 131, n. 11 (novembre 2005). (2005):
- Impact of Labor Factors on Workflow. Dans: Journal of Construction Engineering and Management, v. 130, n. 6 (décembre 2004). (2004):