0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Fuzzy-based Composite Indicator Development Methodology for Evaluating Overall Project Performance

Author(s):


Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 3, v. 21
Page(s): 343-355
DOI: 10.3846/13923730.2014.890644
Abstract:

Construction companies develop and use composite indicators to evaluate their overall project performance. However, the conventional methodology of composite indicator development causes “the indiscrimination problem”, a low degree of performance discrimination due to low resolution of measurement, and “the redundancy problem”, an incorrect evaluation caused by interrelation among sub-indicators. To address these problems, we propose a novel methodology that uses fuzzy theories. The proposed methodology includes the utility function for normalizing, the fuzzy measure for weighting, and the fuzzy integral for aggregating. A retrospective case study on 52 real projects shows that our proposed methodology can help alleviate the indiscrimination and redundancy problems: the proposed methodology significantly improved the degree of performance discrimination (0.29 to 0.92) and changed ranks of under- or overestimated projects by taking the interactions of sub-indicators into account. Our methodology can contribute more accurate evaluation of overall project performance with higher degrees of performance discrimination.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2014.890644.
  • About this
    data sheet
  • Reference-ID
    10354519
  • Published on:
    13/08/2019
  • Last updated on:
    13/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine