Method for Calculating Schedule Delay Considering Lost Productivity
Author(s): |
Hyun-Soo Lee
Han-Guk Ryu Jung-Ho Yu Jae-Jun Kim |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, November 2005, n. 11, v. 131 |
Page(s): | 1147-1154 |
DOI: | 10.1061/(asce)0733-9364(2005)131:11(1147) |
- About this
data sheet - Reference-ID
10156090 - Published on:
07/12/2018 - Last updated on:
07/12/2018