Pasit Lorterapong
- Project-Network Analysis Using Fuzzy Sets Theory. In: Journal of Construction Engineering and Management, v. 122, n. 4 (December 1996). (1996):
- Construction Scheduling Using the Constraint Satisfaction Problem Method. In: Journal of Construction Engineering and Management, v. 139, n. 4 (April 2013). (2013):
- A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects. In: Journal of Construction Engineering and Management, v. 142, n. 3 (March 2016). (2016):
- Near optimal solution for resource-constrained scheduling problems. In: Construction Management and Economics, v. 11, n. 4 (July 1993). (1993):
- Least impact algorithm for resource allocation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 2 (April 1993). (1993):