Construction Scheduling Using the Constraint Satisfaction Problem Method
Author(s): |
Pasit Lorterapong
Mongkol Ussavadilokrit |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, April 2013, n. 4, v. 139 |
Page(s): | 414-422 |
DOI: | 10.1061/(asce)co.1943-7862.0000582 |
- About this
data sheet - Reference-ID
10169630 - Published on:
11/12/2018 - Last updated on:
11/12/2018