A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects
Author(s): |
Paijit Pawan
Pasit Lorterapong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, March 2016, n. 3, v. 142 |
Page(s): | 04015083 |
DOI: | 10.1061/(asce)co.1943-7862.0001073 |
- About this
data sheet - Reference-ID
10170304 - Published on:
11/12/2018 - Last updated on:
11/12/2018