Pasit Lorterapong
- Project-Network Analysis Using Fuzzy Sets Theory. Dans: Journal of Construction Engineering and Management, v. 122, n. 4 (décembre 1996). (1996):
- Construction Scheduling Using the Constraint Satisfaction Problem Method. Dans: Journal of Construction Engineering and Management, v. 139, n. 4 (avril 2013). (2013):
- A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 3 (mars 2016). (2016):
- Near optimal solution for resource-constrained scheduling problems. Dans: Construction Management and Economics, v. 11, n. 4 (juillet 1993). (1993):
- Least impact algorithm for resource allocation. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 2 (avril 1993). (1993):