0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Wu, Yi / Xu, Fang / Wu, Xueting / Jiao, Yuyong / Sun, Tao / Li, Zhiwei / Yang, Fan / Li, Heng / Li, Bin / Xu, Jin / Chen, Shengying / Liu, Yamei / Zhu, Jing (2024): Retardation mechanism of phosphogypsum in phosphogypsum-based excess-sulfate cement. In: Construction and Building Materials, v. 428 (May 2024).

    https://doi.org/10.1016/j.conbuildmat.2024.136293

  2. Zhang, Yuxuan / Chen, Junyu / Liu, Hexu / Chen, Yuan / Xiao, Bo / Li, Heng (2024): Recent advancements of human-centered design in building engineering: A comprehensive review. In: Journal of Building Engineering, v. 84 (May 2024).

    https://doi.org/10.1016/j.jobe.2024.108529

  3. Shringi, Ankit / Arashpour, Mehrdad / Dwyer, Tim / Prouzeau, Arnaud / Li, Heng (2023): Safety in Off-Site Construction: Simulation of Crane-Lifting Operations Using VR and BIM. In: Journal of Architectural Engineering (ASCE), v. 29, n. 1 (March 2023).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000570

  4. Xiao, Lei / Hua, Jianmin / Li, Heng / Xue, Xuanyi / Wang, Neng / Wang, Fei (2022): Quantitative analysis on post–fire–resistant performance of high–strength steel plate girders using LSTM. In: Journal of Constructional Steel Research, v. 199 (December 2022).

    https://doi.org/10.1016/j.jcsr.2022.107588

  5. Li, Fangxin / Li, Heng / Kim, Min‐Koo (2022): Registration‐free point cloud generation technique using rotating mirrors. In: Computer-Aided Civil and Infrastructure Engineering, v. 37, n. 2 (4 January 2022).

    https://doi.org/10.1111/mice.12707

  6. Ren, Qiubing / Li, Mingchao / Li, Heng / Song, Lingguang / Si, Wen / Liu, Han (2021): A robust prediction model for displacement of concrete dams subjected to irregular water‐level fluctuations. In: Computer-Aided Civil and Infrastructure Engineering, v. 36, n. 5 (May 2021).

    https://doi.org/10.1111/mice.12654

  7. Wang, Fan / Li, Heng / Zhang, Qi-Ling (2017): Response–Surface–Based Embankment Reliability under Incomplete Probability Information. In: International Journal of Geomechanics, v. 17, n. 12 (December 2017).

    https://doi.org/10.1061/(asce)gm.1943-5622.0001017

  8. Xu, Zhao / Zayed, Tarek / Lin, Yi-Hsin / Wang, Shaozhe / Li, Heng (2020): Relationship between Social Media and ASCE Code of Ethics: Review and Case-Based Discussion. In: Journal of Civil Engineering Education, v. 146, n. 2 (April 2020).

    https://doi.org/10.1061/(asce)ei.2643-9115.0000005

  9. Gharbia, Marwan / Chang-Richards, Alice / Lu, Yuqian / Zhong, Ray Y. / Li, Heng (2020): Robotic technologies for on-site building construction: A systematic review. In: Journal of Building Engineering, v. 32 (November 2020).

    https://doi.org/10.1016/j.jobe.2020.101584

  10. Arashpour, Mehrdad / Ngo, Tuan / Li, Heng (2021): Scene understanding in construction and buildings using image processing methods: A comprehensive review and a case study. In: Journal of Building Engineering, v. 33 (January 2021).

    https://doi.org/10.1016/j.jobe.2020.101672

  11. Cao, Dongping / Li, Heng / Wang, Guangbin / Luo, Xiaochun / Tan, Dan (2018): Relationship Network Structure and Organizational Competitiveness: Evidence from BIM Implementation Practices in the Construction Industry. In: Journal of Management in Engineering (ASCE), v. 34, n. 3 (May 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000600

  12. Fan, Hongqin / Xue, Fan / Li, Heng (2015): Project-Based As-Needed Information Retrieval from Unstructured AEC Documents. In: Journal of Management in Engineering (ASCE), v. 31, n. 1 (January 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000341

  13. Li, Heng (1996): The role of IT manager in construction process re‐engineering. The relationship between construction managers and the information technology manager is analysed and the challenges confronting the it manager during re‐engineering are presented. In: Building Research & Information, v. 24, n. 2 ( 1996).

    https://doi.org/10.1080/09613219608727512

  14. Li, Heng / Chen, Zhen / Wong, Conrad T. C. / Love, Peter E. D. (2002): A quantitative approach to construction pollution control based on resource levelling. In: Construction Innovation, v. 2, n. 2 (September 2002).

    https://doi.org/10.1108/14714170210814694

  15. Zhang, Hong / Yan, Xuzhong / Li, Heng / Jin, Rui / Fu, HongFeng (2019): Real-Time Alarming, Monitoring, and Locating for Non-Hard-Hat Use in Construction. In: Journal of Construction Engineering and Management, v. 145, n. 3 (March 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001629

  16. Luo, Xiaochun / Li, Heng / Cao, Dongping / Dai, Fei / Seo, JoonOh / Lee, SangHyun (2018): Recognizing Diverse Construction Activities in Site Images via Relevance Networks of Construction-Related Objects Detected by Convolutional Neural Networks. In: Journal of Computing in Civil Engineering, v. 32, n. 3 (May 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000756

  17. Wang, Fan / Li, Heng (2018): The role of copulas in random fields: Characterization and application. In: Structural Safety, v. 75 (November 2018).

    https://doi.org/10.1016/j.strusafe.2018.05.006

  18. Umer, Waleed / Li, Heng / Szeto, Grace Pui Yuk / Wong, Arnold Y. L. (2018): Proactive Safety Measures: Quantifying the Upright Standing Stability after Sustained Rebar Tying Postures. In: Journal of Construction Engineering and Management, v. 144, n. 4 (April 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001458

  19. Li, Heng / Chan, Greg / Wong, Johnny Kwok Wai / Skitmore, Martin (2016): Real-time locating systems applications in construction. In: Automation in Construction, v. 63 (March 2016).

    https://doi.org/10.1016/j.autcon.2015.12.001

  20. Cao, J. / Chan, Jackie Y. K. / Li, Heng / Mahdjoubi, Lamine / Love, Peter E. D. (2001): REALMEDIA: providing multimedia-based real-estate services through the Internet. In: Automation in Construction, v. 10, n. 2 (January 2001).

    https://doi.org/10.1016/s0926-5805(99)00033-3

  21. Ding, L. Y. / Yu, H. L. / Li, Heng / Zhou, C. / Wu, X. G. / Yu, M. H. (2012): Safety risk identification system for metro construction on the basis of construction drawings. In: Automation in Construction, v. 27 (November 2012).

    https://doi.org/10.1016/j.autcon.2012.05.010

  22. Dong, Chao / Li, Heng / Luo, Xiaochun / Ding, Lieyun / Siebert, Joanna / Luo, Hanbin (2018): Proactive struck-by risk detection with movement patterns and randomness. In: Automation in Construction, v. 91 (July 2018).

    https://doi.org/10.1016/j.autcon.2018.03.021

  23. Lu, Weisheng / Huang, George Q. / Li, Heng (2011): Scenarios for applying RFID technology in construction project management. In: Automation in Construction, v. 20, n. 2 (March 2011).

    https://doi.org/10.1016/j.autcon.2010.09.007

  24. Fan, Hongqin / Li, Heng (2013): Retrieving similar cases for alternative dispute resolution in construction accidents using text mining techniques. In: Automation in Construction, v. 34 (September 2013).

    https://doi.org/10.1016/j.autcon.2012.10.014

  25. Li, Heng / Lu, Miaojia / Chan, Greg / Skitmore, Martin (2015): Proactive training system for safe and efficient precast installation. In: Automation in Construction, v. 49 (January 2015).

    https://doi.org/10.1016/j.autcon.2014.10.010

  26. Song, Jiqiang / Su, Feng / Li, Heng / Cai, Shijie (2002): Raster to vector conversion of construction engineering drawings. In: Automation in Construction, v. 11, n. 5 (August 2002).

    https://doi.org/10.1016/s0926-5805(01)00069-3

  27. Lu, Ming / Li, Heng (2003): Resource-Activity Critical-Path Method for Construction Planning. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(412)

  28. Love, Peter E. D. / Li, Heng (2000): Quantifying the causes and costs of rework in construction. In: Construction Management and Economics, v. 18, n. 4 (June 2000).

    https://doi.org/10.1080/01446190050024897

  29. Li, Heng / Lu, Weisheng / Huang, Ting (2009): Rethinking project management and exploring virtual design and construction as a potential solution. In: Construction Management and Economics, v. 27, n. 4 (April 2009).

    https://doi.org/10.1080/01446190902838217

  30. Li, Heng / Guo, H. L. / Skitmore, Martin / Huang, Ting / Chan, K. Y. N. / Chan, Greg (2011): Rethinking prefabricated construction management using the VP‐based IKEA model in Hong Kong. In: Construction Management and Economics, v. 29, n. 3 (March 2011).

    https://doi.org/10.1080/01446193.2010.545994

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine