A quantitative approach to construction pollution control based on resource levelling
Author(s): |
Heng Li
Zhen Chen Conrad T. C. Wong Peter E. D. Love |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction Innovation, September 2002, n. 2, v. 2 |
Page(s): | 71-81 |
DOI: | 10.1108/14714170210814694 |
- About this
data sheet - Reference-ID
10325722 - Published on:
21/07/2019 - Last updated on:
21/07/2019