-
Wang, Lei / Li, Heng / Wu, Haitao / Yao, Yizhi / Yu, Changyuan / Umer, Waleed / Han, Dongliang / Ma, Jie (2024): Monitoring Mental Fatigue of Construction Equipment Operators: A Smart Cushion–Based Method with Deep Learning Algorithms. In: Journal of Management in Engineering (ASCE), v. 40, n. 5 (September 2024).
https://doi.org/10.1061/jmenea.meeng-5913
-
Fang, Xin / Li, Heng / Ma, Jie / Xing, Xuejiao / Ren, Qiubing / Umer, Waleed / Wang, Lei (2024): Online Assessment of Spontaneous Mental Fatigue in Construction Workers Considering Data Quality: Improved Online Sequential Extreme Learning Machine. In: Journal of Construction Engineering and Management, v. 150, n. 11 (November 2024).
https://doi.org/10.1061/jcemd4.coeng-14670
-
Zhang, Boshan / Yu, Jiangjiang / Chen, Weizhen / Liu, Hang / Li, Heng (2024): Multi-scale investigation on the interfacial behavior of between NC and UHPC in flexural members considering influence of the interface morphology. In: Composite Structures, v. 345 (October 2024).
https://doi.org/10.1016/j.compstruct.2024.118388
-
Mehmood, Imran / Li, Heng / Umer, Waleed / Arsalan, Aamir / Anwer, Shahnawaz / Mirza, Mohammed Aquil / Ma, Jie / Antwi-Afari, Maxwell Fordjour (2023): Multimodal integration for data-driven classification of mental fatigue during construction equipment operations: Incorporating electroencephalography, electrodermal activity, and video signals. In: Developments in the Built Environment, v. 15 (October 2023).
https://doi.org/10.1016/j.dibe.2023.100198
-
Alsharif, Rashed / Arashpour, Mehrdad / Golafshani, Emad / Rashidi, Ali / Li, Heng (2023): Multi-objective optimization of shading devices using ensemble machine learning and orthogonal design of experiments. In: Energy and Buildings, v. 283 (March 2023).
https://doi.org/10.1016/j.enbuild.2023.112840
-
Yu, Jiangjiang / Zhang, Boshan / Chen, Weizhen / Liu, Hang / Li, Heng (2022): Multi-scale study on interfacial bond failure between normal concrete (NC) and ultra-high performance concrete (UHPC). In: Journal of Building Engineering, v. 57 (October 2022).
https://doi.org/10.1016/j.jobe.2022.104808
-
Wu, Haiato / Zhong, Botao / Li, Heng / Guo, Jiadong / Wang, Yuhang (2021): On-Site Construction Quality Inspection Using Blockchain and Smart Contracts. In: Journal of Management in Engineering (ASCE), v. 37, n. 6 (November 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000967
-
Li, Heng (1996): Neural network models for intelligent support of mark‐up estimation. In: Engineering, Construction and Architectural Management, v. 3, n. 1 (January 1996).
https://doi.org/10.1108/eb021023
-
Li, Heng / Cheng, Eddie W. L. / Love, Peter E. D. (2000): Partnering research in construction. In: Engineering, Construction and Architectural Management, v. 7, n. 1 (January 2000).
https://doi.org/10.1108/eb021134
-
Wang, Fan / Li, Heng (2021): On the use of the maximum entropy method for reliability evaluation involving stochastic process modeling. In: Structural Safety, v. 88 (January 2021).
https://doi.org/10.1016/j.strusafe.2020.102028
-
Chen, Zhen / Clements-Croome, Derek / Hong, Ju / Li, Heng / Xu, Qian (2006): A multicriteria lifespan energy efficiency approach to intelligent building assessment. In: Energy and Buildings, v. 38, n. 5 (May 2006).
https://doi.org/10.1016/j.enbuild.2005.08.001
-
Zhong, Botao / Li, Heng / Luo, Hanbin / Zhou, Jingyang / Fang, Weili / Xing, Xuejiao (2020): Ontology-Based Semantic Modeling of Knowledge in Construction: Classification and Identification of Hazards Implied in Images. In: Journal of Construction Engineering and Management, v. 146, n. 4 (April 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001767
-
Li, Heng (1995): Neural networks for construction cost estimation. On the positive side neural networks demonstrate many features that are coherent with the nature of cost estimation. Major strengths include their ability to self‐organize knowledge from training data, their ability to generate results from incomplete information and their ability to cope with complex relations. These largely resemble the way human estimators develop expertize through experience. In: Building Research & Information, v. 23, n. 5 ( 1995).
https://doi.org/10.1080/09613219508727476
-
Li, Heng (1995): A new connectionist approach to implementing knowledge‐based construction performance management systems — conceptual design. Explores how connectionist models can be adapted to model important aspects of construction diagnostic processes. In: Building Research & Information, v. 23, n. 3 ( 1995).
https://doi.org/10.1080/09613219508727449
-
Zhong, Botao / Hei, Yongjian / Li, Heng / Rose, Timothy / Luo, Hanbin (2019): Patent Cooperative Patterns and Development Trends of Chinese Construction Enterprises: A Network Analysis. In: Journal of Civil Engineering and Management, v. 25, n. 3 (June 2019).
https://doi.org/10.3846/jcem.2019.8137
-
Xiao, Xue / Wang, Fan / Li, Heng / Skitmore, Martin (2018): Modelling the Stochastic Dependence Underlying Construction Cost and Duration. In: Journal of Civil Engineering and Management, v. 24, n. 6 (October 2018).
https://doi.org/10.3846/jcem.2018.5712
-
Xing, Xuejiao / Li, Heng / Li, Jue / Zhong, Botao / Luo, Hanbin / Skitmore, Martin (2019): A multicomponent and neurophysiological intervention for the emotional and mental states of high-altitude construction workers. In: Automation in Construction, v. 105 (September 2019).
https://doi.org/10.1016/j.autcon.2019.102836
-
Kim, Min-Koo / Wang, Qian / Li, Heng (2019): Non-contact sensing based geometric quality assessment of buildings and civil structures: A review. In: Automation in Construction, v. 100 (April 2019).
https://doi.org/10.1016/j.autcon.2019.01.002
-
Li, Heng / Chan, Greg / Skitmore, Martin (2012): Multiuser Virtual Safety Training System for Tower Crane Dismantlement. In: Journal of Computing in Civil Engineering, v. 26, n. 5 (September 2012).
https://doi.org/10.1061/(asce)cp.1943-5487.0000170
-
Faniran, Olusegun O. / Love, Peter E. D. / Li, Heng (1999): Optimal Allocation of Construction Planning Resources. In: Journal of Construction Engineering and Management, v. 125, n. 5 (September 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:5(311)
-
Zhang, Hong / Li, Heng / Lu, Ming (2008): Modeling Time-Constraints in Construction Operations through Simulation. In: Journal of Construction Engineering and Management, v. 134, n. 7 (July 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:7(545)
-
Zhang, Hong / Tam, C. M. / Li, Heng (2006): Multimode Project Scheduling Based on Particle Swarm Optimization. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 2 (February 2006).
https://doi.org/10.1111/j.1467-8667.2005.00420.x
-
Li, Heng / Chan, Neo / Huang, Ting / Guo, H. L. / Lu, Weisheng / Skitmore, Martin (2009): Optimizing construction planning schedules by virtual prototyping enabled resource analysis. In: Automation in Construction, v. 18, n. 7 (November 2009).
https://doi.org/10.1016/j.autcon.2009.04.002
-
Zhang, Hong / Li, Xiaodong / Li, Heng / Huang, Fulai (2005): Particle swarm optimization-based schemes for resource-constrained project scheduling. In: Automation in Construction, v. 14, n. 3 (June 2005).
https://doi.org/10.1016/j.autcon.2004.08.006
-
Zhang, Hong / Li, Yang / Li, Heng (2013): Multi-agent simulation of the dynamic evolutionary process in Chinese urban housing market based on the GIS: The case of Beijing. In: Automation in Construction, v. 35 (November 2013).
https://doi.org/10.1016/j.autcon.2013.05.010
-
Kong, Liulin / Li, Heng / Luo, Hanbin / Ding, Lieyun / Luo, Xiaochun / Skitmore, Martin (2017): Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates. In: Automation in Construction, v. 81 (September 2017).
https://doi.org/10.1016/j.autcon.2017.03.016
-
Zhang, Hong / Li, Heng / Tam, C. M. (2006): Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. In: Journal of Construction Engineering and Management, v. 132, n. 3 (March 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:3(259)
-
Zhang, Hong / Tam, C. M. / Li, Heng / Shi, Jonathan Jingsheng (2006): Particle Swarm Optimization-Supported Simulation for Construction Operations. In: Journal of Construction Engineering and Management, v. 132, n. 12 (December 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:12(1267)
-
Love, Peter E. D. / Mandal, Purnendu / Smith, Jim / Li, Heng (2000): Modelling the dynamics of design error induced rework in construction. In: Construction Management and Economics, v. 18, n. 5 (July 2000).
https://doi.org/10.1080/014461900407374
-
Zhang, Hong / Li, Heng (2010): Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems. In: Construction Management and Economics, v. 28, n. 1 (January 2010).
https://doi.org/10.1080/01446190903406170