0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Mehmood, Imran / Li, Heng / Umer, Waleed / Arsalan, Aamir / Anwer, Shahnawaz / Mirza, Mohammed Aquil / Ma, Jie / Antwi-Afari, Maxwell Fordjour (2023): Multimodal integration for data-driven classification of mental fatigue during construction equipment operations: Incorporating electroencephalography, electrodermal activity, and video signals. In: Developments in the Built Environment, v. 15 (October 2023).

    https://doi.org/10.1016/j.dibe.2023.100198

  2. Alsharif, Rashed / Arashpour, Mehrdad / Golafshani, Emad / Rashidi, Ali / Li, Heng (2023): Multi-objective optimization of shading devices using ensemble machine learning and orthogonal design of experiments. In: Energy and Buildings, v. 283 (March 2023).

    https://doi.org/10.1016/j.enbuild.2023.112840

  3. Yu, Jiangjiang / Zhang, Boshan / Chen, Weizhen / Liu, Hang / Li, Heng (2022): Multi-scale study on interfacial bond failure between normal concrete (NC) and ultra-high performance concrete (UHPC). In: Journal of Building Engineering, v. 57 (October 2022).

    https://doi.org/10.1016/j.jobe.2022.104808

  4. Love, Peter E. D. / Irani, Zahir / Cheng, Eddie / Li, Heng (2002): A model for supporting inter‐organizational relations in the supply chain. In: Engineering, Construction and Architectural Management, v. 9, n. 1 (January 2002).

    https://doi.org/10.1108/eb021202

  5. Chen, Zhen / Clements-Croome, Derek / Hong, Ju / Li, Heng / Xu, Qian (2006): A multicriteria lifespan energy efficiency approach to intelligent building assessment. In: Energy and Buildings, v. 38, n. 5 (May 2006).

    https://doi.org/10.1016/j.enbuild.2005.08.001

  6. Wang, Liping / Li, Heng / Zou, Xuecheng / Shen, Xubang (2015): Lighting system design based on a sensor network for energy savings in large industrial buildings. In: Energy and Buildings, v. 105 (October 2015).

    https://doi.org/10.1016/j.enbuild.2015.07.053

  7. Li, Xiaoying / Li, Heng / Cao, Dongping / Tang, Yixuan / Luo, Xiaochun / Wang, Guangbin (2019): Modeling Dynamics of Project-Based Collaborative Networks for BIM Implementation in the Construction Industry: Empirical Study in Hong Kong. In: Journal of Construction Engineering and Management, v. 145, n. 12 (December 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001726

  8. Sepasgozar, Samad M. E. / Davis, Steven R. / Li, Heng / Luo, Xianrui (2018): Modeling the Implementation Process for New Construction Technologies: Thematic Analysis Based on Australian and U.S. Practices. In: Journal of Management in Engineering (ASCE), v. 34, n. 3 (May 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000608

  9. Cao, Dongping / Li, Heng / Wang, Guangbin / Zhang, Wenjuan (2016): Linking the Motivations and Practices of Design Organizations to Implement Building Information Modeling in Construction Projects: Empirical Study in China. In: Journal of Management in Engineering (ASCE), v. 32, n. 6 (November 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000453

  10. Guo, H. L. / Li, Heng / Skitmore, Martin (2010): Life-Cycle Management of Construction Projects Based on Virtual Prototyping Technology. In: Journal of Management in Engineering (ASCE), v. 26, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)0742-597x(2010)26:1(41)

  11. Xiao, Xue / Wang, Fan / Li, Heng / Skitmore, Martin (2018): Modelling the Stochastic Dependence Underlying Construction Cost and Duration. In: Journal of Civil Engineering and Management, v. 24, n. 6 (October 2018).

    https://doi.org/10.3846/jcem.2018.5712

  12. Zhong, Botao / Wu, Haitao / Ding, Lieyun / Love, Peter E. D. / Li, Heng / Luo, Hanbin / Jiao, Li (2019): Mapping computer vision research in construction: Developments, knowledge gaps and implications for research. In: Automation in Construction, v. 107 (November 2019).

    https://doi.org/10.1016/j.autcon.2019.102919

  13. Chen, Zhen / Li, Heng / Kong, Stephen C. W. / Xu, Qian (2005): A knowledge‐driven management approach to environmental‐conscious construction. In: Construction Innovation, v. 5, n. 1 (March 2005).

    https://doi.org/10.1108/14714170510815159

  14. Cheng, Eddie W. L. / Li, Heng / Love, Peter / Irani, Zahir (2004): A learning culture for strategic partnering in construction. In: Construction Innovation, v. 4, n. 1 (March 2004).

    https://doi.org/10.1108/14714170410815006

  15. Xing, Xuejiao / Li, Heng / Li, Jue / Zhong, Botao / Luo, Hanbin / Skitmore, Martin (2019): A multicomponent and neurophysiological intervention for the emotional and mental states of high-altitude construction workers. In: Automation in Construction, v. 105 (September 2019).

    https://doi.org/10.1016/j.autcon.2019.102836

  16. Yu, Yantao / Yang, Xincong / Li, Heng / Luo, Xiaochun / Guo, Hongling / Fang, Qi (2019): Joint-Level Vision-Based Ergonomic Assessment Tool for Construction Workers. In: Journal of Construction Engineering and Management, v. 145, n. 5 (May 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001647

  17. Chen, Zhen / Li, Heng / Ross, Andrew / Khalfan, Malik M. / Kong, Stephen C. (2008): Knowledge-Driven ANP Approach to Vendors Evaluation for Sustainable Construction. In: Journal of Construction Engineering and Management, v. 134, n. 12 (December 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:12(928)

  18. Liu, Zhi / Wang, Hongwei / Li, Heng (2018): Model of Equipment Sharing between Contractors on Construction Projects. In: Journal of Construction Engineering and Management, v. 144, n. 6 (June 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001485

  19. Umer, Waleed / Li, Heng / Szeto, Grace Pui Yuk / Wong, Arnold Y. L. (2017): Low-Cost Ergonomic Intervention for Mitigating Physical and Subjective Discomfort during Manual Rebar Tying. In: Journal of Construction Engineering and Management, v. 143, n. 10 (October 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001383

  20. Zhang, Hong / Li, Heng / Lu, Ming (2008): Modeling Time-Constraints in Construction Operations through Simulation. In: Journal of Construction Engineering and Management, v. 134, n. 7 (July 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:7(545)

  21. Zhang, Hong / Tam, C. M. / Li, Heng (2006): Multimode Project Scheduling Based on Particle Swarm Optimization. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 2 (February 2006).

    https://doi.org/10.1111/j.1467-8667.2005.00420.x

  22. Xue, Xiaolong / Shen, Qiping / Fan, Hongqin / Li, Heng / Fan, Shichao (2012): IT supported collaborative work in A/E/C projects: A ten-year review. In: Automation in Construction, v. 21 (January 2012).

    https://doi.org/10.1016/j.autcon.2011.05.016

  23. Cheng, Feifei / Li, Heng / Wang, Y.-W. / Skitmore, Martin / Forsythe, Perry (2013): Modeling resource management in the building design process by information constraint Petri nets. In: Automation in Construction, v. 29 (January 2013).

    https://doi.org/10.1016/j.autcon.2012.08.005

  24. Zhang, Hong / Li, Yang / Li, Heng (2013): Multi-agent simulation of the dynamic evolutionary process in Chinese urban housing market based on the GIS: The case of Beijing. In: Automation in Construction, v. 35 (November 2013).

    https://doi.org/10.1016/j.autcon.2013.05.010

  25. Wang, Shuhua / Cao, Yang / Yang, Ruo Yu / Li, Heng (2002): A knowledge-based system for automatic measurement of steel reinforcement. In: Automation in Construction, v. 11, n. 5 (August 2002).

    https://doi.org/10.1016/s0926-5805(01)00070-x

  26. Cheng, Eddie W. L. / Li, Heng (2006): Job Performance Evaluation for Construction Companies: An Analytic Network Process Approach. In: Journal of Construction Engineering and Management, v. 132, n. 8 (August 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:8(827)

  27. Cheng, Eddie W. / Li, Heng / Fox, Paul (2007): Job Performance Dimensions for Improving Final Project Outcomes. In: Journal of Construction Engineering and Management, v. 133, n. 8 (August 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:8(592)

  28. Love, Peter E. D. / Mandal, Purnendu / Smith, Jim / Li, Heng (2000): Modelling the dynamics of design error induced rework in construction. In: Construction Management and Economics, v. 18, n. 5 (July 2000).

    https://doi.org/10.1080/014461900407374

  29. Dong, Chao / Wang, Fan / Li, Heng / Ding, Lieyun / Luo, Hanbin (2018): Knowledge dynamics-integrated map as a blueprint for system development: Applications to safety risk management in Wuhan metro project. In: Automation in Construction, v. 93 (September 2018).

    https://doi.org/10.1016/j.autcon.2018.05.014

  30. Xu, Zhao / Li, Suhao / Li, Heng / Li, Qiming (2018): Modeling and problem solving of building defects using point clouds and enhanced case-based reasoning. In: Automation in Construction, v. 96 (December 2018).

    https://doi.org/10.1016/j.autcon.2018.09.003

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine