- (2024): The Decision-Making Trial and Evaluation Laboratory Approach to the Assessment and Hierarchy of Factors Shaping the Costs of Facade Systems. In: Buildings, v. 14, n. 6 (19 June 2024).
- Prioritization of the Requirements Formulated in the European Standard EN 206 in Assessment of Concrete Quality - Multicriteria Analysis Using the AHP Method. In: Civil and Environmental Engineering Reports, v. 34, n. 1 (1 March 2024). (2024):
- Ryzyko rotacji pracowników w przedsiębiorstwie budowlanym. In: Builder, v. 297, n. 4 (March 2022). (2022):
- Inwestycje według FIDIC. Kryteria wyboru inżyniera kontraktu. In: Builder, v. 273, n. 4 (March 2020). (2020):
- Roboty dodatkowe w inwestycjach kolejowych. In: Builder, v. 270, n. 1 (December 2019). (2019):
- Faktory opóźnień. In: Builder, v. 259, n. 2 (February 2019). (2019):
- Application of the Bayesian Networks in Construction Engineering. In: Civil and Environmental Engineering Reports, v. 30, n. 2 (June 2020). (2020):
- Analysis of Errors in Investors’ in the Procedure of Obtaining a Building Permit. In: Civil and Environmental Engineering Reports, v. 29, n. 4 (December 2019). (2019):
- Scan-to-BIM method in construction: assessment of the 3D buildings model accuracy in terms inventory measurements. In: Building Research & Information, v. 50, n. 8 (June 2022). (2022):
- Limitations of Cost Estimation Using Building Information Modeling in Poland. In: Journal of Civil Engineering and Architecture, v. 7, n. 5 (May 2013). (2013):
- Bidding factors in procurements of design documentation. In: Budownictwo i Architektura, v. 13, n. 4 (December 2014). (2014):
- Modeling the Decision-Making Process Concerning Participation in Construction Bidding. In: Journal of Management in Engineering (ASCE), v. 31, n. 2 (March 2015). (2015):