0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bidding factors in procurements of design documentation

Author(s):
Medium: journal article
Language(s): English
Published in: Budownictwo i Architektura, , n. 4, v. 13
Page(s): 373-380
DOI: 10.35784/bud-arch.1871
Abstract:

The present study described a group of factors that may influence the decision to participate in a tender, when the subject of the order is the preparation of design documentation. The importance of the proposed factors was based on the opinions of designers who perform such services at the construction market. This analysis is followed by an assessment of the conformity of the opinions by means of the dispersion coefficient of relative ranking. The values of the dispersion coefficient of a relative classification differ considerably, from one another depending on the value under assessment. Yet, it is worth noticing that in the assessment of the factors influencing a bid/no bid decision, experts’ subjectivism cannot be avoided.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.35784/bud-arch.1871.
  • About this
    data sheet
  • Reference-ID
    10475864
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine