Sangyoub Lee
- Analysis of Development Cost Based on Planning Characteristics of Multifamily Housing Development Projects. In: Journal of Urban Planning and Development, v. 137, n. 3 (September 2011). (2011):
- Framework for the validation of simulation-based productivity analysis: focused on curtain wall construction process. In: Journal of Civil Engineering and Management, v. 23, n. 2 (February 2017). (2017):
- Technical Comparisons of Simulation-Based Productivity Prediction Methodologies By Means of Estimation Tools Focusing on Conventional Earthmovings/ Imitacinių produktyvumo prognozavimo metodikųtechninis palyginimas, pasitelkus vertinimo priemones, akcent. In: Journal of Civil Engineering and Management, v. 17, n. 2 (July 2011). (2011):
- A mixed (continuous + discrete) time-cost trade-off model considering four different relationships with lag time. In: KSCE Journal of Civil Engineering, v. 17, n. 2 (March 2013). (2013):
- Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels. In: Automation in Construction, v. 16, n. 2 (March 2007). (2007):
- Optimization of floor-level construction material layout using Genetic Algorithms. In: Automation in Construction, v. 16, n. 4 (July 2007). (2007):
- Predictive Tool for Estimating Accident Risk. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003). (2003):
- Quantifying effects of accidents by fuzzy-logic- and simulation-based analysis. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 3 (March 2006). (2006):
- Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 9 (September 2006). (2006):
- Activity vulnerability index for delay risk forecasting. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 10 (October 2006). (2006):
- Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 3 (March 2008). (2008):
- Production prediction of conventional and global positioning system–based earthmoving systems using simulation and multiple regression analysis. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 6 (June 2008). (2008):
- Quantified benefit of implementing enterprise resource planning through process simulation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 31, n. 2 (February 2004). (2004):