Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model
Author(s): |
Sangchul Kim
Chanjeong Park Sangyoub Lee Jaeho Son |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Canadian Journal of Civil Engineering / Revue canadienne de génie civil, March 2008, n. 3, v. 35 |
Page(s): | 225-235 |
DOI: | 10.1139/l07-094 |
- About this
data sheet - Reference-ID
10137269 - Published on:
03/12/2018 - Last updated on:
03/12/2018