0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A mixed (continuous + discrete) time-cost trade-off model considering four different relationships with lag time

Author(s):


Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 2, v. 17
Page(s): 281-291
DOI: 10.1007/s12205-013-1506-3
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-013-1506-3.
  • About this
    data sheet
  • Reference-ID
    10171771
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine