Sangyoub Lee
- Analysis of Development Cost Based on Planning Characteristics of Multifamily Housing Development Projects. Dans: Journal of Urban Planning and Development, v. 137, n. 3 (septembre 2011). (2011):
- Framework for the validation of simulation-based productivity analysis: focused on curtain wall construction process. Dans: Journal of Civil Engineering and Management, v. 23, n. 2 (février 2017). (2017):
- Technical Comparisons of Simulation-Based Productivity Prediction Methodologies By Means of Estimation Tools Focusing on Conventional Earthmovings/ Imitacinių produktyvumo prognozavimo metodikųtechninis palyginimas, pasitelkus vertinimo priemones, akcent. Dans: Journal of Civil Engineering and Management, v. 17, n. 2 (juillet 2011). (2011):
- A mixed (continuous + discrete) time-cost trade-off model considering four different relationships with lag time. Dans: KSCE Journal of Civil Engineering, v. 17, n. 2 (mars 2013). (2013):
- Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels. Dans: Automation in Construction, v. 16, n. 2 (mars 2007). (2007):
- Optimization of floor-level construction material layout using Genetic Algorithms. Dans: Automation in Construction, v. 16, n. 4 (juillet 2007). (2007):
- Predictive Tool for Estimating Accident Risk. Dans: Journal of Construction Engineering and Management, v. 129, n. 4 (août 2003). (2003):
- Quantifying effects of accidents by fuzzy-logic- and simulation-based analysis. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 3 (mars 2006). (2006):
- Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 9 (septembre 2006). (2006):
- Activity vulnerability index for delay risk forecasting. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 10 (octobre 2006). (2006):
- Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 3 (mars 2008). (2008):
- Production prediction of conventional and global positioning system–based earthmoving systems using simulation and multiple regression analysis. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 6 (juin 2008). (2008):
- Quantified benefit of implementing enterprise resource planning through process simulation. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 31, n. 2 (février 2004). (2004):