Technical Comparisons of Simulation-Based Productivity Prediction Methodologies By Means of Estimation Tools Focusing on Conventional Earthmovings/ Imitacinių produktyvumo prognozavimo metodikųtechninis palyginimas, pasitelkus vertinimo priemones, akcent
Auteur(s): |
Seungwoo Han
Taehoon Hong Gwangho Kim Sangyoub Lee |
---|---|
Médium: | article de revue |
Langue(s): | letton |
Publié dans: | Journal of Civil Engineering and Management, juillet 2011, n. 2, v. 17 |
Page(s): | 265-277 |
DOI: | 10.3846/13923730.2011.574381 |
- Informations
sur cette fiche - Reference-ID
10363038 - Publié(e) le:
12.08.2019 - Modifié(e) le:
12.08.2019