-
Hong, Juwon / Song, Sangkil / Ahn, Chiwan / Koo, ChoongWan / Lee, Dong-Eun / Seon Park, Hyo / Hong, Taehoon (2024): Impact of environmental pollutants on work performance using virtual reality. In: Automation in Construction, v. 168 (December 2024).
https://doi.org/10.1016/j.autcon.2024.105833
-
Choi, Jewoo / Lee, Seung Hyeong / Hong, Taehoon / Lee, Dong-Eun / Seon Park, Hyo (2024): Multi-objective Green Design Model Based on Costs, Co2 Emissions and Serviceability for High-rise Buildings With a Mega-structure System. In: Journal of Civil Engineering and Management, v. 30, n. 4 (15 April 2024).
https://doi.org/10.3846/jcem.2024.21357
-
Hong, Juwon / Song, Sangkil / Kang, Hyuna / Choi, Jinwoo / Hong, Taehoon / Lee, Dong-Eun (2024): Influence of visual environments on struck-by hazards for construction equipment operators through virtual eye-tracking. In: Automation in Construction, v. 161 (May 2024).
https://doi.org/10.1016/j.autcon.2024.105341
-
Lee, Dong-Eun / Choi, Young / Hong, Geuntae / Maruthi, M. / Yi, Chang-Yong / Park, Young- Jun (2024): Parametric Image-Based Concrete Defect Assessment Method. In: Case Studies in Construction Materials, v. 20 (July 2024).
https://doi.org/10.1016/j.cscm.2024.e02962
-
Park, Jun Su / Jang, Seung Kyu / Hong, Taehoon / Lee, Dong-Eun / Seon Park, Hyo (2024): Mapping top-two-floor corner coordinates to building strains in deep latent space. In: Journal of Building Engineering, v. 82 (April 2024).
https://doi.org/10.1016/j.jobe.2023.108279
-
Choi, Jewoo / Hong, Do Hun / Lee, Seung Hyeong / Lee, Ha Yeon / Hong, Taehoon / Lee, Dong-Eun / Seon Park, Hyo (2022): Multi-objective green design model for prestressed concrete slabs in long-span buildings. In: Architectural Engineering and Design Management, v. 19, n. 5 (November 2022).
https://doi.org/10.1080/17452007.2022.2147897
-
Mandal, Soumen / Singh, Jitendra Kumar / Mallapur, Srinivas / Lee, Dong-Eun / Park, Taejoon (2022): Effect of triethanolamine and sodium hexametaphosphate on formation, growth and breakdown of passive layer in concrete pore solution. In: Journal of Building Engineering, v. 59 (November 2022).
https://doi.org/10.1016/j.jobe.2022.105113
-
Kim, Bubryur / Lee, Dong-Eun / Preethaa, K. R. Sri / Hu, Gang / Natarajan, Yuvaraj / Kwok, K. C. S. (2021): Predicting wind flow around buildings using deep learning. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 219 (December 2021).
https://doi.org/10.1016/j.jweia.2021.104820
-
Kim, Bubryur / Yuvaraj, N. / Park, Hee Won / Preethaa, K. R. Sri / Pandian, R. Arun / Lee, Dong-Eun (2021): Investigation of steel frame damage based on computer vision and deep learning. In: Automation in Construction, v. 132 (December 2021).
https://doi.org/10.1016/j.autcon.2021.103941
-
Li, Fangxin / Kim, Min-Koo / Lee, Dong-Eun (2021): Geometrical model based scan planning approach for the classification of rebar diameters. In: Automation in Construction, v. 130 (October 2021).
https://doi.org/10.1016/j.autcon.2021.103848
-
Kim, Bubryur / Yuvaraj, N. / Tse, K. T. / Lee, Dong-Eun / Hu, Gang (2021): Pressure pattern recognition in buildings using an unsupervised machine-learning algorithm. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 214 (July 2021).
https://doi.org/10.1016/j.jweia.2021.104629
-
Kim, JiWook / Golabchi, Alireza / Han, SangUk / Lee, Dong-Eun (2021): Manual operation simulation using motion-time analysis toward labor productivity estimation: A case study of concrete pouring operations. In: Automation in Construction, v. 126 (June 2021).
https://doi.org/10.1016/j.autcon.2021.103669
-
Park, Sung-Sik / Nong, Zhen-Zhen / Lee, Dong-Eun (2020): Effect of vertical effective and initial static shear stresses on the liquefaction resistance of sands in cyclic direct simple shear tests. In: Soils and Foundations, v. 60, n. 6 (December 2020).
https://doi.org/10.1016/j.sandf.2020.09.007
-
Yun, Da Yo / Kim, Doyoung / Kim, Minsun / Bae, Sang Geun / Choi, Jae Woo / Shim, Hak Bo / Hong, Taehoon / Lee, Dong-Eun / Seon Park, Hyo (2021): Field measurements for identification of modal parameters for high-rise buildings under construction or in use. In: Automation in Construction, v. 121 (January 2021).
https://doi.org/10.1016/j.autcon.2020.103446
-
Yeom, Seungkeun / Kim, Hakpyeong / Hong, Taehoon / Seon Park, Hyo / Lee, Dong-Eun (2020): An integrated psychological score for occupants based on their perception and emotional response according to the windows’ outdoor view size. In: Building and Environment, v. 180 (August 2020).
https://doi.org/10.1016/j.buildenv.2020.107019
-
Lee, Dong-Eun / Lim, Tae-Kyung / Arditi, David (2011): An Expert System for Auditing Quality Management Systems in Construction. An Expert system for auditing quality management systems. In: Computer-Aided Civil and Infrastructure Engineering, v. 26, n. 8 ( 2011).
https://doi.org/10.1111/j.1467-8667.2011.00721.x
-
Hong, Juwon / Kang, Hyuna / Jung, Seunghoon / Sung, Seulki / Hong, Taehoon / Seon Park, Hyo / Lee, Dong-Eun (2020): An empirical analysis of environmental pollutants on building construction sites for determining the real-time monitoring indices. In: Building and Environment, v. 170 (March 2020).
https://doi.org/10.1016/j.buildenv.2019.106636
-
An, Jongbaek / Hong, Taehoon / Oh, Jeongyoon / Jung, Woojin / Jeong, Kwangbok / Seon Park, Hyo / Lee, Dong-Eun (2019): An optimal implementation strategy of the multi-function window considering the nonlinearity of its technical-environmental-economic performance by window ventilation system size. In: Building and Environment, v. 161 (August 2019).
https://doi.org/10.1016/j.buildenv.2019.106234
-
Gyu Lee, Min / An, Jung Hwan / Bae, Sang Geun / Oh, Hyung Seok / Choi, Jewoo / Yun, Da Yo / Hong, Taehoon / Lee, Dong-Eun / Seon Park, Hyo (2020): Multi-objective sustainable design model for integrating CO2 emissions and costs for slabs in office buildings. In: Structure and Infrastructure Engineering, v. 16, n. 8 (October 2020).
https://doi.org/10.1080/15732479.2019.1683590
-
Park, Jin-Young / Lee, Dong-Eun / Kim, Byung-Soo (2019): Environmental Performance Analysis and Economic Perspectives of Concrete Girders. In: KSCE Journal of Civil Engineering, v. 23, n. 11 (October 2019).
https://doi.org/10.1007/s12205-019-0812-9
-
Kim, Jae-Min / Lee, Eun-Haeng / Lee, Dong-Eun / Lee, Changho / Yang, Seongyeong (2018): Influence of Radius of Central Soil Column in POINT Module of the SASSI Program on Seismic Response of Foundation. In: Journal of Earthquake Engineering, v. 22, n. 3 ( 2018).
https://doi.org/10.1080/13632469.2016.1264321
-
Lee, Dong-Eun / Yi, Chang-Yong / Lim, Tae-Kyung / Arditi, David (2010): Integrated Simulation System for Construction Operation and Project Scheduling. In: Journal of Computing in Civil Engineering, v. 24, n. 6 (November 2010).
https://doi.org/10.1061/(asce)cp.1943-5487.0000061
-
Rezakhani, Pejman / Jang, Won-Suk / Lee, Sangwook / Lee, Dong-Eun (2014): Project risk assessment model combining the fuzzy weighted average principle with a similarity measure. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (January 2014).
https://doi.org/10.1007/s12205-014-0053-x
-
Lee, Sangwook / Esmaeilzadeh, Afshin / Lee, Dong-Eun (2013): Graduate construction management programs in the U.S.: Lessons learned from leading institutions. In: KSCE Journal of Civil Engineering, v. 17, n. 7 (October 2013).
https://doi.org/10.1007/s12205-013-0493-8
-
Gwak, Han-Seong / Son, Sang-Hyuk / Park, Young-Jun / Lee, Dong-Eun (2016): Exact Time–Cost Tradeoff Analysis in Concurrency-Based Scheduling. In: Journal of Construction Engineering and Management, v. 142, n. 10 (October 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001164
-
Lim, Tae-Kyung / Gwak, Han-Seong / Kim, Byung-Soo / Lee, Dong-Eun (2014): Integrated carbon emission estimation method for construction operation and project scheduling. In: KSCE Journal of Civil Engineering, v. 20, n. 4 (December 2014).
https://doi.org/10.1007/s12205-015-0360-x
-
Lee, Dong-Eun / Arditi, David / Son, Chang-baek (2012): The probability distribution of project completion times in simulation-based scheduling. In: KSCE Journal of Civil Engineering, v. 17, n. 4 (December 2012).
https://doi.org/10.1007/s12205-013-0147-x
-
Gwak, Han-Seong / Seo, Jongwon / Lee, Dong-Eun (2018): Optimal cut-fill pairing and sequencing method in earthwork operation. In: Automation in Construction, v. 87 (March 2018).
https://doi.org/10.1016/j.autcon.2017.12.010
-
Yasamis-Speroni, Firuzan / Lee, Dong-Eun / Arditi, David (2012): Evaluating the Quality Performance of Pavement Contractors. In: Journal of Construction Engineering and Management, v. 138, n. 10 (October 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000539
-
Lee, Dong-Eun (2005): Probability of Project Completion Using Stochastic Project Scheduling Simulation. In: Journal of Construction Engineering and Management, v. 131, n. 3 (March 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:3(310)