Manual operation simulation using motion-time analysis toward labor productivity estimation: A case study of concrete pouring operations
Author(s): |
JiWook Kim
Alireza Golabchi SangUk Han Dong-Eun Lee |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, June 2021, v. 126 |
Page(s): | 103669 |
DOI: | 10.1016/j.autcon.2021.103669 |
- About this
data sheet - Reference-ID
10601943 - Published on:
17/04/2021 - Last updated on:
17/04/2021