0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Son, Chang-baek / Shin, Won-Sang / Lee, Dong-Eun (2013): Analyzing the Working Conditions for Female Field Managers Employed by General Contractors. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 5 (October 2013).

    https://doi.org/10.5345/jkibc.2013.13.5.441

  2. Choi, Ju-Hee / Kim, Dongyoun / Ko, Min-Sam / Lee, Dong-Eun / Wi, Kwangwoo / Lee, Han-Seung (2023): Compressive strength prediction of ternary-blended concrete using deep neural network with tuned hyperparameters. In: Journal of Building Engineering, v. 75 (September 2023).

    https://doi.org/10.1016/j.jobe.2023.107004

  3. Kim, Jong-Won / Mun, Ju-Hyun / Kim, Sanghee / Yang, Keun-Hyeok / Sim, Jae-Il / Jung, Yeon-Back / Lee, Dong-Eun (2023): Actual NOX and SOX removal rates in the atmospheric environment of concrete permeable blocks containing TiO2 powders, coconut shell powders, and zeolite beads. In: Construction and Building Materials, v. 403 (November 2023).

    https://doi.org/10.1016/j.conbuildmat.2023.133032

  4. Thanh Tran, Duc / Lee, Han-Seung / Singh, Jitendra Kumar / Lee, Dong-Eun (2023): Corrosion prevention of steel rebar embedded in the cement mortar under accelerated conditions: Combined effects of phosphate and chloride ions. In: Construction and Building Materials, v. 365 (February 2023).

    https://doi.org/10.1016/j.conbuildmat.2022.130042

  5. Yang, Juneseok / Arditi, David / Lee, Dong-Eun / Mutis, Ivan (2022): Delay Analysis Selection Model for a Construction Project. In: KSCE Journal of Civil Engineering, v. 26, n. 12 (September 2022).

    https://doi.org/10.1007/s12205-022-2394-1

  6. Choi, Jinwoo / Hong, Juwon / Kang, Hyuna / Hong, Taehoon / Seon Park, Hyo / Lee, Dong-Eun (2022): An automatic decision model for optimal noise barrier plan in terms of health impact, productivity, and cost aspects. In: Building and Environment, v. 216 (May 2022).

    https://doi.org/10.1016/j.buildenv.2022.109033

  7. Hong, Juwon / Kang, Hyuna / Hong, Taehoon / Seon Park, Hyo / Lee, Dong-Eun (2022): Construction noise rating based on legal and health impacts. In: Automation in Construction, v. 134 (February 2022).

    https://doi.org/10.1016/j.autcon.2021.104053

  8. Hong, Taehoon / Sung, Seulki / Kang, Hyuna / Hong, Juwon / Kim, Hakpyeong / Lee, Dong-Eun (2022): Advanced Real-Time Pollutant Monitoring Systems for Automatic Environmental Management of Construction Projects Focusing on Field Applicability. In: Journal of Management in Engineering (ASCE), v. 38, n. 1 (January 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0000980

  9. Nong, Zhen-Zhen / Park, Sung-Sik / Lee, Dong-Eun (2021): Comparison of sand liquefaction in cyclic triaxial and simple shear tests. In: Soils and Foundations, v. 61, n. 4 (August 2021).

    https://doi.org/10.1016/j.sandf.2021.05.002

  10. Hong, Juwon / Kang, Hyuna / Hong, Taehoon / Seon Park, Hyo / Lee, Dong-Eun (2021): Development of a prediction model for the proportion of buildings exposed to construction noise in excess of the construction noise regulation at urban construction sites. In: Automation in Construction, v. 125 (May 2021).

    https://doi.org/10.1016/j.autcon.2021.103656

  11. Choi, Jinwoo / Kang, Hyuna / Hong, Taehoon / Baek, Hoyoung / Lee, Dong-Eun (2021): Automated noise exposure assessment model for the health of construction workers. In: Automation in Construction, v. 126 (June 2021).

    https://doi.org/10.1016/j.autcon.2021.103657

  12. Lee, Bokyeong / Choi, Hyeonggil / Min, Byongwang / Ryu, Jungrim / Lee, Dong-Eun (2021): Development of formwork automation design software for improving construction productivity. In: Automation in Construction, v. 126 (June 2021).

    https://doi.org/10.1016/j.autcon.2021.103680

  13. Kim, Min-Koo / Thedja, Julian Pratama Putra / Chi, Hung-Lin / Lee, Dong-Eun (2021): Automated rebar diameter classification using point cloud data based machine learning. In: Automation in Construction, v. 122 (February 2021).

    https://doi.org/10.1016/j.autcon.2020.103476

  14. Park, Sung-Sik / Le, Trung-Tri / Nong, Zhenzhen / Moon, Hong-Duk / Lee, Dong-Eun (2020): Chemically Induced Calcium Carbonate Precipitation for Improving Strength of Sand. In: Journal of Materials in Civil Engineering (ASCE), v. 32, n. 9 (September 2020).

    https://doi.org/10.1061/(asce)mt.1943-5533.0003318

  15. Lee, Hyung-Guk / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2015): An Advanced Stochastic Time-Cost Tradeoff Analysis Based on a CPM-Guided Genetic Algorithm. In: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 10 (June 2015).

    https://doi.org/10.1111/mice.12148

  16. Lim, Tae-Kyung / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2014): Concurrent Construction Scheduling Simulation Algorithm. In: Computer-Aided Civil and Infrastructure Engineering, v. 29, n. 6 (March 2014).

    https://doi.org/10.1111/mice.12073

  17. Sackey, Solomon / Lee, Dong-Eun / Kim, Byung-Soo (2020): Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy. In: KSCE Journal of Civil Engineering, v. 24, n. 3 (February 2020).

    https://doi.org/10.1007/s12205-020-0407-5

  18. Kim, Ryul-Hee / Park, Young-Jun / Lee, Dong-Eun (2019): Dozer Productivity Correction Method for Eco-Dozing Assessment. In: KSCE Journal of Civil Engineering, v. 23, n. 7 (June 2019).

    https://doi.org/10.1007/s12205-019-0180-5

  19. Son, Chang-Back / Jang, Won-Suk / Lee, Dong-Eun (2014): Effect of changes in the construction economy on worker's operating rates and productivity. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (January 2014).

    https://doi.org/10.1007/s12205-014-0125-y

  20. Kim, Byung-Soo / Jang, Won-Suk / Lee, Dong-Eun (2014): Analysis of the CO2 emission characteristics of earthwork equipment. In: KSCE Journal of Civil Engineering, v. 19, n. 1 (July 2014).

    https://doi.org/10.1007/s12205-014-0679-8

  21. Lee, Dong-Eun / Shi, Jonathan J. (2006): Construction Business Automation System. In: Journal of Construction Engineering and Management, v. 132, n. 1 (January 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:1(88)

  22. Shin, Dong-Pil / Park, Young-Jun / Seo, Jongwon / Lee, Dong-Eun (2017): Association Rules Mined from Construction Accident Data. In: KSCE Journal of Civil Engineering, v. 22, n. 4 (June 2017).

    https://doi.org/10.1007/s12205-017-0537-6

  23. Park, Jin-Young / Lee, Dong-Eun / Kim, Byung-Soo (2017): Development of environmental load-estimating model for road planning phase: Focus on road earthwork. In: KSCE Journal of Civil Engineering, v. 22, n. 2 (June 2017).

    https://doi.org/10.1007/s12205-017-0029-8

  24. Lee, Hong-Chul / Gwak, Han-Seong / Seo, Jongwon / Lee, Dong-Eun (2018): Eco-economic excavator configuration method. In: Automation in Construction, v. 86 (February 2018).

    https://doi.org/10.1016/j.autcon.2017.11.006

  25. Lee, Dong-Eun / Lim, Tae-Kyung / Arditi, David (2009): Automated stochastic quality function deployment system for measuring the quality performance of design/build contractors. In: Automation in Construction, v. 18, n. 3 (May 2009).

    https://doi.org/10.1016/j.autcon.2008.10.002

  26. Jang, Won-Suk / Lee, Dong-Eun / Choi, Jae-ho (2012): Ad-hoc performance of wireless sensor network for large scale civil and construction engineering applications. In: Automation in Construction, v. 26 (October 2012).

    https://doi.org/10.1016/j.autcon.2012.05.001

  27. Park, Young-Jun / Gwak, Han-Seong / Lee, Dong-Eun (2017): Dozer Workability Estimation Method for Economic Dozing. In: Journal of Construction Engineering and Management, v. 143, n. 2 (February 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001228

  28. Lim, Tae-Kyung / Park, Sang-Min / Lee, Hong-Chul / Lee, Dong-Eun (2016): Artificial Neural Network–Based Slip-Trip Classifier Using Smart Sensor for Construction Workplace. In: Journal of Construction Engineering and Management, v. 142, n. 2 (February 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001049

  29. Lee, Dong-Eun / Arditi, David (2006): Automated Statistical Analysis in Stochastic Project Scheduling Simulation. In: Journal of Construction Engineering and Management, v. 132, n. 3 (March 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(268)

  30. Arditi, David / Lee, Dong-Eun (2003): Assessing the corporate service quality performance of design-build contractors using quality function deployment. In: Construction Management and Economics, v. 21, n. 2 (February 2003).

    https://doi.org/10.1080/0144619032000079716

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine