0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Son, Chang-baek / Shin, Won-Sang / Lee, Dong-Eun (2013): Analyzing the Working Conditions for Female Field Managers Employed by General Contractors. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 5 (octobre 2013).

    https://doi.org/10.5345/jkibc.2013.13.5.441

  2. Choi, Ju-Hee / Kim, Dongyoun / Ko, Min-Sam / Lee, Dong-Eun / Wi, Kwangwoo / Lee, Han-Seung (2023): Compressive strength prediction of ternary-blended concrete using deep neural network with tuned hyperparameters. Dans: Journal of Building Engineering, v. 75 (septembre 2023).

    https://doi.org/10.1016/j.jobe.2023.107004

  3. Kim, Jong-Won / Mun, Ju-Hyun / Kim, Sanghee / Yang, Keun-Hyeok / Sim, Jae-Il / Jung, Yeon-Back / Lee, Dong-Eun (2023): Actual NOX and SOX removal rates in the atmospheric environment of concrete permeable blocks containing TiO2 powders, coconut shell powders, and zeolite beads. Dans: Construction and Building Materials, v. 403 (novembre 2023).

    https://doi.org/10.1016/j.conbuildmat.2023.133032

  4. Thanh Tran, Duc / Lee, Han-Seung / Singh, Jitendra Kumar / Lee, Dong-Eun (2023): Corrosion prevention of steel rebar embedded in the cement mortar under accelerated conditions: Combined effects of phosphate and chloride ions. Dans: Construction and Building Materials, v. 365 (février 2023).

    https://doi.org/10.1016/j.conbuildmat.2022.130042

  5. Yang, Juneseok / Arditi, David / Lee, Dong-Eun / Mutis, Ivan (2022): Delay Analysis Selection Model for a Construction Project. Dans: KSCE Journal of Civil Engineering, v. 26, n. 12 (septembre 2022).

    https://doi.org/10.1007/s12205-022-2394-1

  6. Choi, Jinwoo / Hong, Juwon / Kang, Hyuna / Hong, Taehoon / Seon Park, Hyo / Lee, Dong-Eun (2022): An automatic decision model for optimal noise barrier plan in terms of health impact, productivity, and cost aspects. Dans: Building and Environment, v. 216 (mai 2022).

    https://doi.org/10.1016/j.buildenv.2022.109033

  7. Hong, Juwon / Kang, Hyuna / Hong, Taehoon / Seon Park, Hyo / Lee, Dong-Eun (2022): Construction noise rating based on legal and health impacts. Dans: Automation in Construction, v. 134 (février 2022).

    https://doi.org/10.1016/j.autcon.2021.104053

  8. Hong, Taehoon / Sung, Seulki / Kang, Hyuna / Hong, Juwon / Kim, Hakpyeong / Lee, Dong-Eun (2022): Advanced Real-Time Pollutant Monitoring Systems for Automatic Environmental Management of Construction Projects Focusing on Field Applicability. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 1 (janvier 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0000980

  9. Nong, Zhen-Zhen / Park, Sung-Sik / Lee, Dong-Eun (2021): Comparison of sand liquefaction in cyclic triaxial and simple shear tests. Dans: Soils and Foundations, v. 61, n. 4 (août 2021).

    https://doi.org/10.1016/j.sandf.2021.05.002

  10. Hong, Juwon / Kang, Hyuna / Hong, Taehoon / Seon Park, Hyo / Lee, Dong-Eun (2021): Development of a prediction model for the proportion of buildings exposed to construction noise in excess of the construction noise regulation at urban construction sites. Dans: Automation in Construction, v. 125 (mai 2021).

    https://doi.org/10.1016/j.autcon.2021.103656

  11. Choi, Jinwoo / Kang, Hyuna / Hong, Taehoon / Baek, Hoyoung / Lee, Dong-Eun (2021): Automated noise exposure assessment model for the health of construction workers. Dans: Automation in Construction, v. 126 (juin 2021).

    https://doi.org/10.1016/j.autcon.2021.103657

  12. Lee, Bokyeong / Choi, Hyeonggil / Min, Byongwang / Ryu, Jungrim / Lee, Dong-Eun (2021): Development of formwork automation design software for improving construction productivity. Dans: Automation in Construction, v. 126 (juin 2021).

    https://doi.org/10.1016/j.autcon.2021.103680

  13. Kim, Min-Koo / Thedja, Julian Pratama Putra / Chi, Hung-Lin / Lee, Dong-Eun (2021): Automated rebar diameter classification using point cloud data based machine learning. Dans: Automation in Construction, v. 122 (février 2021).

    https://doi.org/10.1016/j.autcon.2020.103476

  14. Park, Sung-Sik / Le, Trung-Tri / Nong, Zhenzhen / Moon, Hong-Duk / Lee, Dong-Eun (2020): Chemically Induced Calcium Carbonate Precipitation for Improving Strength of Sand. Dans: Journal of Materials in Civil Engineering (ASCE), v. 32, n. 9 (septembre 2020).

    https://doi.org/10.1061/(asce)mt.1943-5533.0003318

  15. Lee, Hyung-Guk / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2015): An Advanced Stochastic Time-Cost Tradeoff Analysis Based on a CPM-Guided Genetic Algorithm. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 10 (juin 2015).

    https://doi.org/10.1111/mice.12148

  16. Lim, Tae-Kyung / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2014): Concurrent Construction Scheduling Simulation Algorithm. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 29, n. 6 (mars 2014).

    https://doi.org/10.1111/mice.12073

  17. Sackey, Solomon / Lee, Dong-Eun / Kim, Byung-Soo (2020): Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy. Dans: KSCE Journal of Civil Engineering, v. 24, n. 3 (février 2020).

    https://doi.org/10.1007/s12205-020-0407-5

  18. Kim, Ryul-Hee / Park, Young-Jun / Lee, Dong-Eun (2019): Dozer Productivity Correction Method for Eco-Dozing Assessment. Dans: KSCE Journal of Civil Engineering, v. 23, n. 7 (juin 2019).

    https://doi.org/10.1007/s12205-019-0180-5

  19. Son, Chang-Back / Jang, Won-Suk / Lee, Dong-Eun (2014): Effect of changes in the construction economy on worker's operating rates and productivity. Dans: KSCE Journal of Civil Engineering, v. 18, n. 2 (janvier 2014).

    https://doi.org/10.1007/s12205-014-0125-y

  20. Kim, Byung-Soo / Jang, Won-Suk / Lee, Dong-Eun (2014): Analysis of the CO2 emission characteristics of earthwork equipment. Dans: KSCE Journal of Civil Engineering, v. 19, n. 1 (juillet 2014).

    https://doi.org/10.1007/s12205-014-0679-8

  21. Lee, Dong-Eun / Shi, Jonathan J. (2006): Construction Business Automation System. Dans: Journal of Construction Engineering and Management, v. 132, n. 1 (janvier 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:1(88)

  22. Shin, Dong-Pil / Park, Young-Jun / Seo, Jongwon / Lee, Dong-Eun (2017): Association Rules Mined from Construction Accident Data. Dans: KSCE Journal of Civil Engineering, v. 22, n. 4 (juin 2017).

    https://doi.org/10.1007/s12205-017-0537-6

  23. Park, Jin-Young / Lee, Dong-Eun / Kim, Byung-Soo (2017): Development of environmental load-estimating model for road planning phase: Focus on road earthwork. Dans: KSCE Journal of Civil Engineering, v. 22, n. 2 (juin 2017).

    https://doi.org/10.1007/s12205-017-0029-8

  24. Lee, Hong-Chul / Gwak, Han-Seong / Seo, Jongwon / Lee, Dong-Eun (2018): Eco-economic excavator configuration method. Dans: Automation in Construction, v. 86 (février 2018).

    https://doi.org/10.1016/j.autcon.2017.11.006

  25. Lee, Dong-Eun / Lim, Tae-Kyung / Arditi, David (2009): Automated stochastic quality function deployment system for measuring the quality performance of design/build contractors. Dans: Automation in Construction, v. 18, n. 3 (mai 2009).

    https://doi.org/10.1016/j.autcon.2008.10.002

  26. Jang, Won-Suk / Lee, Dong-Eun / Choi, Jae-ho (2012): Ad-hoc performance of wireless sensor network for large scale civil and construction engineering applications. Dans: Automation in Construction, v. 26 (octobre 2012).

    https://doi.org/10.1016/j.autcon.2012.05.001

  27. Park, Young-Jun / Gwak, Han-Seong / Lee, Dong-Eun (2017): Dozer Workability Estimation Method for Economic Dozing. Dans: Journal of Construction Engineering and Management, v. 143, n. 2 (février 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001228

  28. Lim, Tae-Kyung / Park, Sang-Min / Lee, Hong-Chul / Lee, Dong-Eun (2016): Artificial Neural Network–Based Slip-Trip Classifier Using Smart Sensor for Construction Workplace. Dans: Journal of Construction Engineering and Management, v. 142, n. 2 (février 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001049

  29. Lee, Dong-Eun / Arditi, David (2006): Automated Statistical Analysis in Stochastic Project Scheduling Simulation. Dans: Journal of Construction Engineering and Management, v. 132, n. 3 (mars 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(268)

  30. Arditi, David / Lee, Dong-Eun (2003): Assessing the corporate service quality performance of design-build contractors using quality function deployment. Dans: Construction Management and Economics, v. 21, n. 2 (février 2003).

    https://doi.org/10.1080/0144619032000079716

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine