David Knight
- Modular by necessity - Bracklinn falls footbridge. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering. :
- Viewpoint: Engineer 2050 – a day in the life. In: The Structural Engineer, v. 95, n. 1 (January 2017). (2017):
- The Dinosaur Bridge – Innovation in Structural Form & Fabrication Using Model Making and Prototyping. In: Structural Engineering International, v. 31, n. 4 (October 2021). (2021):
- (2022): The Dinosaur Bridge – innovation in structural form & fabrication. Presented at: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- Dynamic compression of square honeycomb structures during underwater impulsive loading. In: Journal of Mechanics of Materials and Structures, v. 2, n. 10 (December 2007). (2007):
- SUB-PLAN: A Guide to Permitted Development. In: arq: Architectural Research Quarterly, v. 16, n. 3 (September 2012). (2012):
- Embodied carbon dioxide as a design tool – a case study. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 164, n. 4 (November 2011). (2011):
- The development of a footbridge design through the UK planning process - the Greenwich Reach Footbridge. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):