David Knight
- Viewpoint: Ethics and the climate emergency: personal values and corporate decision making. Dans: The Structural Engineer, v. 102, n. 9 (2 septembre 2024). (2024):
- Cody Dock Rolling Bridge, London – innovation through collaboration. Dans: The Structural Engineer, v. 102, n. 5 (1 mai 2024). (2024):
- (2024): Fabrication’s role in a world in emergency: reducing environmental impact by collaboration. Présenté pendant: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2024): Cody Dock Rolling Bridge: infrastructure and place. Présenté pendant: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2024): Bracklinn Falls Footbridge: efficient modular design. Présenté pendant: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- Modular by necessity - Bracklinn falls footbridge. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering. :
- Viewpoint: Engineer 2050 – a day in the life. Dans: The Structural Engineer, v. 95, n. 1 (janvier 2017). (2017):
- The Dinosaur Bridge – Innovation in Structural Form & Fabrication Using Model Making and Prototyping. Dans: Structural Engineering International, v. 31, n. 4 (octobre 2021). (2021):
- (2022): The Dinosaur Bridge – innovation in structural form & fabrication. Présenté pendant: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- Dynamic compression of square honeycomb structures during underwater impulsive loading. Dans: Journal of Mechanics of Materials and Structures, v. 2, n. 10 (décembre 2007). (2007):
- SUB-PLAN: A Guide to Permitted Development. Dans: arq: Architectural Research Quarterly, v. 16, n. 3 (septembre 2012). (2012):
- Embodied carbon dioxide as a design tool – a case study. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 164, n. 4 (novembre 2011). (2011):
- The development of a footbridge design through the UK planning process - the Greenwich Reach Footbridge. Présenté pendant: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):