Modular by necessity - Bracklinn falls footbridge
Auteur(s): |
David Knight
(Cake Engineering, Cambridge, UK)
Keith Brownlie (BEAM Architects, Dorset, UK) James Marks (BEAM Architects, Dorset, UK) Murray McKellar (Loch Lomond and the Trossachs National Park, UK) Danny Boothman (AECOM, Glasgow, UK) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Bridge Engineering |
Page(s): | 1-29 |
DOI: | 10.1680/jbren.23.00016 |
Ouvrages et projets
- Informations
sur cette fiche - Reference-ID
10758618 - Publié(e) le:
23.03.2024 - Modifié(e) le:
23.03.2024