0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Cody Dock Rolling Bridge, London – innovation through collaboration

Auteur(s):




Médium: article de revue
Langue(s): anglais
Publié dans: The Structural Engineer, , n. 5, v. 102
Page(s): 24-32
DOI: 10.56330/rawo8903
Abstrait:

Cody Dock, near the mouth of London's River Lea, is being brought back into use following years of dereliction. A new steel footbridge was commissioned to span over the dock mouth. The bridge allows the passage of vessels into the dock by rolling along a track such that the deck turns upside down and is lifted clear of the navigation envelope. The bridge is carefully counterweighted so the centre of gravity is approximately level, allowing the 13.2t structure to roll using only a hand-cranked winch. Despite the simplicity of this movement, the design process and fabrication revealed complex and unique engineering challenges. This article gives an overview of these, as well as discussing in more detail how certain complexities associated with the delivery of the project were overcome.

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.56330/rawo8903.
  • Informations
    sur cette fiche
  • Reference-ID
    10783755
  • Publié(e) le:
    20.06.2024
  • Modifié(e) le:
    20.06.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine