0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Byung-Cheol Kim

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kim, Seong-Kyum / Park, Jong-Kwon / Han, Sang-Hee / Kim, Byung-Cheol / Jang, Il-Young (2015): Base Plate로 보강된 기둥-기초 접합부의 뚫림전단강도 연구 (A Study on Punching Shear of Column-Foundation Joint Connection for Reinforced Steel Base Plate). In: Journal of the Korea Institute for Structural Maintenance and Inspection (한국구조물진단유지관리공학회 논문집), v. 19, n. 2 (March 2015).

    https://doi.org/10.11112/jksmi.2015.19.2.001

  2. Kim, Seong-Kyum / Park, Jong-Kwon / Han, Sang-Hee / Kim, Byung-Cheol / Jang, Il-Young (2014): 반복 횡하중을 받는 원형 철근콘크리트 기둥의 Helical Bar 보강효과에 대한 연구 (Study on Reinforcement Effect of Circular RC Columns by Helical Bar Under Cyclic Lateral Load). In: Journal of the Korea Institute for Structural Maintenance and Inspection (한국구조물진단유지관리공학회 논문집), v. 18, n. 1 (January 2014).

    https://doi.org/10.11112/jksmi.2014.18.1.048

  3. Kim, Byung-Cheol / Pinto, Jeffrey K. (2019): What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion. In: Journal of Management in Engineering (ASCE), v. 35, n. 2 (March 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000671

  4. Kim, Byung-Cheol (2016): Probabilistic Evaluation of Cost Performance Stability in Earned Value Management. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000383

  5. Kim, Byung-Cheol (2015): Dynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000309

  6. Kim, Byung-Cheol / Kim, Seong Jin (2015): Credibility Evaluation of Project Duration Forecast Using Forecast Sensitivity and Forecast-Risk Compatibility. In: Journal of Construction Engineering and Management, v. 141, n. 8 (August 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001000

  7. Kim, Byung-Cheol / Reinschmidt, Kenneth F. (2009): Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution. In: Journal of Construction Engineering and Management, v. 135, n. 3 (March 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:3(178)

  8. Kim, Byung-Cheol / Reinschmidt, Kenneth F. (2011): Combination of Project Cost Forecasts in Earned Value Management. In: Journal of Construction Engineering and Management, v. 137, n. 11 (November 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000352

  9. Du, Jing / Kim, Byung-Cheol / Zhao, Dong (2016): Cost Performance as a Stochastic Process: EAC Projection by Markov Chain Simulation. In: Journal of Construction Engineering and Management, v. 142, n. 6 (June 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001115

  10. Kim, Byung-Cheol / Reinschmidt, Kenneth F. (2010): Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method. In: Journal of Construction Engineering and Management, v. 136, n. 8 (August 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000192

  11. Kim, Byung-Cheol / Kim, Hyung-Jin (2014): Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns. In: Journal of Construction Engineering and Management, v. 140, n. 7 (July 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000856

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine