What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion
Author(s): |
Byung-Cheol Kim
Jeffrey K. Pinto |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), March 2019, n. 2, v. 35 |
Page(s): | 04018059 |
DOI: | 10.1061/(asce)me.1943-5479.0000671 |
- About this
data sheet - Reference-ID
10371485 - Published on:
29/08/2019 - Last updated on:
29/08/2019