0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Byung-Cheol Kim

Die folgende Bibliografie enthält alle in dieser Datenbank indizierten Veröffentlichungen, die mit diesem Namen als Autor, Herausgeber oder anderweitig Beitragenden verbunden sind.

  1. Kim, Seong-Kyum / Park, Jong-Kwon / Han, Sang-Hee / Kim, Byung-Cheol / Jang, Il-Young (2015): Base Plate로 보강된 기둥-기초 접합부의 뚫림전단강도 연구 (A Study on Punching Shear of Column-Foundation Joint Connection for Reinforced Steel Base Plate). In: Journal of the Korea Institute for Structural Maintenance and Inspection (한국구조물진단유지관리공학회 논문집), v. 19, n. 2 (März 2015).

    https://doi.org/10.11112/jksmi.2015.19.2.001

  2. Kim, Seong-Kyum / Park, Jong-Kwon / Han, Sang-Hee / Kim, Byung-Cheol / Jang, Il-Young (2014): 반복 횡하중을 받는 원형 철근콘크리트 기둥의 Helical Bar 보강효과에 대한 연구 (Study on Reinforcement Effect of Circular RC Columns by Helical Bar Under Cyclic Lateral Load). In: Journal of the Korea Institute for Structural Maintenance and Inspection (한국구조물진단유지관리공학회 논문집), v. 18, n. 1 (Januar 2014).

    https://doi.org/10.11112/jksmi.2014.18.1.048

  3. Kim, Byung-Cheol / Pinto, Jeffrey K. (2019): What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion. In: Journal of Management in Engineering (ASCE), v. 35, n. 2 (März 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000671

  4. Kim, Byung-Cheol (2016): Probabilistic Evaluation of Cost Performance Stability in Earned Value Management. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (Januar 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000383

  5. Kim, Byung-Cheol (2015): Dynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000309

  6. Kim, Byung-Cheol / Kim, Seong Jin (2015): Credibility Evaluation of Project Duration Forecast Using Forecast Sensitivity and Forecast-Risk Compatibility. In: Journal of Construction Engineering and Management, v. 141, n. 8 (August 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001000

  7. Kim, Byung-Cheol / Reinschmidt, Kenneth F. (2009): Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution. In: Journal of Construction Engineering and Management, v. 135, n. 3 (März 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:3(178)

  8. Kim, Byung-Cheol / Reinschmidt, Kenneth F. (2011): Combination of Project Cost Forecasts in Earned Value Management. In: Journal of Construction Engineering and Management, v. 137, n. 11 (November 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000352

  9. Du, Jing / Kim, Byung-Cheol / Zhao, Dong (2016): Cost Performance as a Stochastic Process: EAC Projection by Markov Chain Simulation. In: Journal of Construction Engineering and Management, v. 142, n. 6 (Juni 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001115

  10. Kim, Byung-Cheol / Reinschmidt, Kenneth F. (2010): Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method. In: Journal of Construction Engineering and Management, v. 136, n. 8 (August 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000192

  11. Kim, Byung-Cheol / Kim, Hyung-Jin (2014): Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns. In: Journal of Construction Engineering and Management, v. 140, n. 7 (Juli 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000856

Eine Veröffentlichung suchen...

Nur verfügbar mit
Mein Structurae

Volltext
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine