Dynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning
Author(s): |
Byung-Cheol Kim
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), September 2015, n. 5, v. 31 |
Page(s): | 04014077 |
DOI: | 10.1061/(asce)me.1943-5479.0000309 |
- About this
data sheet - Reference-ID
10371840 - Published on:
29/08/2019 - Last updated on:
29/08/2019