0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Zdzisław Hejducki ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Hejducki, Zdzisław / Mrozowicz, Juliusz (2001): Stream methods of construction work organization: an introduction to the problem. In: Engineering, Construction and Architectural Management, v. 8, n. 2 (February 2001).

    https://doi.org/10.1108/eb021172

  2. Hejducki, Zdzisław (2004): Sequencing problems in methods of organising construction processes. In: Engineering, Construction and Architectural Management, v. 11, n. 1 (February 2004).

    https://doi.org/10.1108/09699980410512638

  3. Rogalska, Magdalena / Hejducki, Zdzisław (2013): The cost analysis of steel halls designing, according to environmental standards, legal guidelines and market prices. In: Budownictwo i Architektura, v. 12, n. 1 (March 2013).

    https://doi.org/10.35784/bud-arch.2174

  4. Bożejko, Wojciech / Hejducki, Zdzisław / Uchroński, Mariusz / Wodecki, Mieczysław (2014): Solving Resource-constrained Construction Scheduling Problems With Overlaps By Metaheuristic. In: Journal of Civil Engineering and Management, v. 20, n. 5 (October 2014).

    https://doi.org/10.3846/13923730.2014.906496

  5. Boejko, Wojciech / Hejducki, Zdzisław / Wodecki, Mieczysław (2012): Applying Metaheuristic Strategies in Construction Projects Management. In: Journal of Civil Engineering and Management, v. 18, n. 5 (September 2012).

    https://doi.org/10.3846/13923730.2012.719837

  6. Rogalska, Magdalena / Hejducki, Zdzisław (2007): Time Buffers in Construction Process Scheduling. In: Journal of Civil Engineering and Management, v. 13, n. 2 (June 2007).

    https://doi.org/10.3846/13923730.2007.9636430

  7. Hejducki, Zdzisław (2003): Scheduling Model of Construction Activity With Time Couplings. In: Journal of Civil Engineering and Management, v. 9, n. 4 (December 2003).

    https://doi.org/10.3846/13923730.2003.10531341

  8. Rogalska, Magdalena / Bożejko, Wojciech / Hejducki, Zdzisław (2008): Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling. In: Automation in Construction, v. 18, n. 1 (December 2008).

    https://doi.org/10.1016/j.autcon.2008.04.002

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine