Time Buffers in Construction Process Scheduling

Author(s):

Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 2, v. 13
Page(s): 143-148
DOI: 10.3846/13923730.2007.9636430
Abstract:

Potential applications of the CCS/BM method in the scheduling of continuous LSM (Linear Scheduling Model) construction activities are considered. The effect of time buffers – feeding buffers (FB) and project buffers (PB) – on total project realisation time (TT) is examined. Feeding buffers are found to have no direct full influence on TT if construction activities continuity is assumed. The influence of FBs on TT for other conditions considered in this paper still needs to be examined.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2007.9636430.
  • About this
    data sheet
  • Reference-ID
    10363238
  • Published on:
    12/08/2019
  • Last updated on:
    12/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine