Zdzisław Hejducki ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Hejducki, Zdzisław / Mrozowicz, Juliusz (2001): Stream methods of construction work organization: an introduction to the problem. Dans: Engineering, Construction and Architectural Management, v. 8, n. 2 (février 2001).

    https://doi.org/10.1108/eb021172

  2. Hejducki, Zdzisław (2004): Sequencing problems in methods of organising construction processes. Dans: Engineering, Construction and Architectural Management, v. 11, n. 1 (février 2004).

    https://doi.org/10.1108/09699980410512638

  3. Rogalska, Magdalena / Hejducki, Zdzisław (2013): The cost analysis of steel halls designing, according to environmental standards, legal guidelines and market prices. Dans: Budownictwo i Architektura, v. 12, n. 1 (mars 2013).

    https://doi.org/10.35784/bud-arch.2174

  4. Bożejko, Wojciech / Hejducki, Zdzisław / Uchroński, Mariusz / Wodecki, Mieczysław (2014): Solving Resource-constrained Construction Scheduling Problems With Overlaps By Metaheuristic. Dans: Journal of Civil Engineering and Management, v. 20, n. 5 (octobre 2014).

    https://doi.org/10.3846/13923730.2014.906496

  5. Boejko, Wojciech / Hejducki, Zdzisław / Wodecki, Mieczysław (2012): Applying Metaheuristic Strategies in Construction Projects Management. Dans: Journal of Civil Engineering and Management, v. 18, n. 5 (septembre 2012).

    https://doi.org/10.3846/13923730.2012.719837

  6. Rogalska, Magdalena / Hejducki, Zdzisław (2007): Time Buffers in Construction Process Scheduling. Dans: Journal of Civil Engineering and Management, v. 13, n. 2 (juin 2007).

    https://doi.org/10.3846/13923730.2007.9636430

  7. Hejducki, Zdzisław (2003): Scheduling Model of Construction Activity With Time Couplings. Dans: Journal of Civil Engineering and Management, v. 9, n. 4 (décembre 2003).

    https://doi.org/10.3846/13923730.2003.10531341

  8. Rogalska, Magdalena / Bożejko, Wojciech / Hejducki, Zdzisław (2008): Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling. Dans: Automation in Construction, v. 18, n. 1 (décembre 2008).

    https://doi.org/10.1016/j.autcon.2008.04.002

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine