- Stream methods of construction work organization: an introduction to the problem. Dans: Engineering, Construction and Architectural Management, v. 8, n. 2 (février 2001). (2001):
- Sequencing problems in methods of organising construction processes. Dans: Engineering, Construction and Architectural Management, v. 11, n. 1 (février 2004). (2004):
- The cost analysis of steel halls designing, according to environmental standards, legal guidelines and market prices. Dans: Budownictwo i Architektura, v. 12, n. 1 (mars 2013). (2013):
- Solving Resource-constrained Construction Scheduling Problems With Overlaps By Metaheuristic. Dans: Journal of Civil Engineering and Management, v. 20, n. 5 (octobre 2014). (2014):
- Applying Metaheuristic Strategies in Construction Projects Management. Dans: Journal of Civil Engineering and Management, v. 18, n. 5 (septembre 2012). (2012):
- Time Buffers in Construction Process Scheduling. Dans: Journal of Civil Engineering and Management, v. 13, n. 2 (juin 2007). (2007):
- Scheduling Model of Construction Activity With Time Couplings. Dans: Journal of Civil Engineering and Management, v. 9, n. 4 (décembre 2003). (2003):
- Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling. Dans: Automation in Construction, v. 18, n. 1 (décembre 2008). (2008):