Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
Author(s): |
Magdalena Rogalska
Wojciech Bożejko Zdzisław Hejducki |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, December 2008, n. 1, v. 18 |
Page(s): | 24-31 |
DOI: | 10.1016/j.autcon.2008.04.002 |
- About this
data sheet - Reference-ID
10188610 - Published on:
10/12/2018 - Last updated on:
10/12/2018