0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Wojciech Bożejko

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Bożejko, Wojciech / Hejducki, Zdzisław / Uchroński, Mariusz / Wodecki, Mieczysław (2014): Solving Resource-constrained Construction Scheduling Problems With Overlaps By Metaheuristic. In: Journal of Civil Engineering and Management, v. 20, n. 5 (October 2014).

    https://doi.org/10.3846/13923730.2014.906496

  2. Rogalska, Magdalena / Bożejko, Wojciech / Hejducki, Zdzisław (2008): Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling. In: Automation in Construction, v. 18, n. 1 (December 2008).

    https://doi.org/10.1016/j.autcon.2008.04.002

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine